Actuating mechanism water pressure testing system and water pressure testing device thereof
A technology of hydraulic testing and actuators, which is applied in the testing of machines/structural components, measuring devices, testing of mechanical components, etc. It can solve problems such as inability to adjust and cannot guarantee the stability of test pressure, so as to reduce workload and improve Test efficiency and ensure stable results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] The first pressure regulating valve group 21 is connected to test workpiece A, and the pressure value of test workpiece A is 5 kg; when testing workpiece A, the ball valve in the first pressure regulating valve group 21 is opened, and the second pressure regulating valve group 22 and the third pressure regulating valve group The ball valve in the pressure valve group 23 is closed, the outlet of the ball valve is connected to the corresponding test workpiece, the corresponding overflow valve is adjusted to the corresponding 5 kg, the time relay 11 is adjusted to the specified time, the water pump is turned on, and the pressurized water enters through the overflow valve The pressure of the test workpiece is constant at 5 kg; when the pressure holding time is over, the time relay 11 controls the motor to lose power, the water pump stops running, the solenoid valve 1 is powered on and off for reversing, the water pressure in the tested workpiece is released, and the test work...
Embodiment 2
[0061] The first pressure regulating valve group 21 is connected to test workpiece B, and the pressure value of test workpiece B is 15 kilograms; when testing workpiece B, the ball valve in the second pressure regulating valve group 22 is opened, and the first pressure regulating valve group 21 and the third pressure regulating valve group The ball valve in the pressure valve group 23 is closed, the outlet of the ball valve is connected to the corresponding test workpiece, the corresponding overflow valve is adjusted to the corresponding 5 kg, the time relay 11 is adjusted to the specified time, the water pump is turned on, and the pressurized water enters through the overflow valve The pressure of the test workpiece is constant at 15 kg; when the holding time is over, the time relay 11 controls the motor to lose power, the water pump stops running, the solenoid valve 1 is powered on and off for reversing, the water pressure in the tested workpiece is released, and the test work...
Embodiment 3
[0063] The first pressure regulating valve group 21 is connected to test workpiece C, and the pressure value of test workpiece C is 20 kilograms; when testing workpiece C, the ball valve in the third pressure regulating valve group 23 is opened, and the first pressure regulating valve group 21 and the second pressure regulating valve group The ball valve in the pressure valve group 22 is closed, the outlet of the ball valve is connected to the corresponding test workpiece, the corresponding overflow valve is adjusted to the corresponding 20 kg, the time relay 11 is adjusted to the specified time, the water pump is turned on, and the pressurized water enters through the overflow valve The pressure of the test workpiece is constant at 20 kg; when the pressure holding time is over, the time relay 11 controls the motor to lose power, the water pump stops running, the solenoid valve 1 is powered on and off for reversing, the water pressure in the tested workpiece is released, and the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


