Sewage phosphorus removal agent and preparation method thereof
A phosphorus removal agent and sewage technology, applied in chemical instruments and methods, adsorption water/sewage treatment, water/sludge/sewage treatment, etc., can solve the problem of secondary pollution of phosphorus, achieve less usage, convenient recycling, Good purification effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0040] A preparation method of a sewage phosphorus removal treatment agent comprises the following steps:
[0041] (1) Preparation of modified gypsum: The natural gypsum was kept in an oven at 120 ° C for 2 hours, and after natural cooling, it was ground and passed through a 100-mesh sieve;
[0042] (2) Preparation of biochar: The collected rice straw was washed with deionized water, dried at 50 °C for 12 h, heated to 700 °C at a heating rate of 10 °C / min in a vacuum tube furnace, and aerated at 1 L / min throughout the process. Nitrogen gas was introduced at a certain rate, and after pyrolysis for 1 hour, biochar was obtained, and after natural cooling, it was ground to 50 mesh;
[0043] (3) The 1:1 modified gypsum and biochar are evenly mixed by mass to obtain the phosphorus removal agent.
[0044] Add 1 g of the phosphorus remover prepared in Example 1 to 1 L of sewage with a total phosphorus concentration of 1 mg / L and pH=6.5, and mix thoroughly. L, the phosphorus removal ...
Embodiment 2
[0046] A preparation method of a sewage phosphorus removal treatment agent comprises the following steps:
[0047] (1) Preparation of modified gypsum: The natural gypsum was kept in an oven at 120 ° C for 2 hours, and after natural cooling, it was ground and passed through a 100-mesh sieve;
[0048] (2) Preparation of biochar: The collected soybean straw was washed with deionized water and dried at 50°C for 12h. Heating to 600°C at a heating rate of 15°C / min in a vacuum tube furnace, feeding nitrogen at a ventilation rate of 1L / min throughout the process, pyrolyzing for 1 hour, to obtain biochar, after natural cooling, grinding to 35 mesh;
[0049] (3) The 3:7 modified gypsum and biochar are evenly mixed according to the mass ratio, namely, the phosphorus removal agent is obtained.
[0050] Add 1 g of the phosphorus removal agent prepared in Example 2 to 1 L of sewage with a total phosphorus concentration of 5 mg / L and pH=7, and after thorough mixing, the total phosphorus con...
Embodiment 3
[0052] A preparation method of a sewage phosphorus removal treatment agent comprises the following steps:
[0053] (1) Preparation of modified gypsum: The natural gypsum was kept in an oven at 120 ° C for 2 hours, and after natural cooling, it was ground and passed through a 100-mesh sieve;
[0054] (2) Preparation of biochar: The collected corn stalks were washed with deionized water and dried at 50 °C for 12 h. Heating to 650°C at a heating rate of 12°C / min in a vacuum tube furnace, feeding nitrogen gas at a ventilation rate of 1L / min throughout, pyrolysis for 1 hour, to obtain biochar, after natural cooling, grinding to 45 mesh;
[0055] (3) The 4:6 modified gypsum and the biochar are evenly mixed according to the mass ratio to obtain the phosphorus removing agent.
[0056] Add 5g of the phosphorus removal agent prepared in Example 3 to 1L of sewage with a total phosphorus concentration of 50mg / L and pH=8.0, and after thorough mixing, the total phosphorus concentration in ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com