Anticorrosion and antistatic method for oil filling pipe assembly and its mating paint
A filling tube and anti-corrosion technology, which is applied in the direction of epoxy resin coatings and coatings, can solve the problems of unstable electrical conductivity of coatings, affecting coating quality, and long curing time, so as to shorten curing time and speed up coating Good effect of film formation and matching performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1~2
[0013] Embodiment 1-2 single-component epoxy zinc-rich primer, the formula is shown in Table 1
[0014]
raw material name
Specification
Example
1
2
Binder
epoxy resin
E06 (hydroxyl value 0.37, epoxy group 0.04 ~ 0.07, number average
Molecular weight 2900), produced by Wuxi Resin Factory
100
100
crosslinking agent
blocked isocyanate
amino resin
self made
582, Shanghai Xinhua Resin Factory
40
-
-
30
Zinc powder
≥600 mesh
1000
1000
Absorbent
Vinyltrimethoxysilane
Industrial products
6.3
6.3
Propylene glycol methyl ether acetate
Industrial products
Industrial products
154
143
154
143
[0015] The water-absorbing agent used in the above-mentioned examples 1-2 is a silane coup...
Embodiment 5
[0022] Implementation of the anti-corrosion and anti-static method of embodiment 5 refueling pipe assembly
[0023] ①Surface treatment Use alkaline substances such as detergent to degrease and clean the surface of the steel substrate of the oil filling pipe assembly, pickle to remove rust and clean, and soak in zinc-manganese-based medium-temperature (40-55°C) phosphating solution for 2 ~8 minutes, then take it out to wash and dry;
[0024] ② Dip coating with the primer of Example 2, place it at room temperature for 30 minutes, send it into the drying tunnel and solidify at 200°C for 20 minutes, measure the dry film thickness of the anti-corrosion layer formed after cooling to 45-55 μm.
[0025] ③ Dip coating with the antistatic topcoat of Example 4, place at room temperature for 30 minutes, send it into the drying tunnel and solidify at 200°C for 20 minutes, and the total thickness of the dry film formed after cooling is 65-80 μm. At this time, it is the oil filling pipe ass...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com