The invention relates to the technical field of walking
network construction, and discloses a green bridge connection line type walking
network construction method, which comprises the following steps: step 1, collecting road
network data, checking road attributes, and constructing a
traffic network; 2, collecting
greening data, checking a
greening association relationship, and constructing an
ecological network; step 3, setting a connection constraint function; the connection constraint function comprises a target connection constraint function and a walking
reachability constraint function; based on a connection constraint function, screening to obtain an initial line, wherein the constraint condition of the target connection constraint function comprises the number of nodes of different region types; the constraint conditions of the walking
reachability constraint function comprise the number of walking
reachability nodes, the length of a walking
route, the
greening degree along the line and the
walking difficulty; step 4, selecting series connection nodes between the initial lines; and connecting the series nodes to construct a walking network. By constructing the walking network, the service
radius of the green land is effectively increased, and the overall benefit of the existing green land is optimized.