Method for extracting construction engineering pile foundation
A construction engineering and pile foundation technology, applied in the field of civil engineering construction, can solve the problems of inability to drive in, secondary waste of resources, and difficult construction, and achieve the effects of reducing resistance, saving resources, and protecting the environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0025] Example 1:
[0026] A) Preliminary investigation, consult the engineering design drawings and construction materials of the original building from the building archives management department, understand the status of the pile foundation, and more specifically, whether the pile foundation is a pile foundation formed by concrete casting or a pure steel pile foundation, and understand the pile foundation. The length and diameter of the foundation, and the equipment configuration required for pulling the pile is drawn up. In this embodiment, the pile foundation is a steel pile foundation with a circular cross-sectional shape, the diameter of the steel pile foundation is 50 cm, and the length is 5m;
[0027] B) equipment configuration, according to the equipment configuration required for pile pulling proposed in step A), equipped with geological drilling rig, high-pressure jet water pump, air compressor, namely air compressor, jack and hoisting equipment, to obtain a complet...
Example Embodiment
[0034] Example 2:
[0035] Only change the pile foundation in step A) to a concrete casting pile foundation with a diameter of 80cm and a length of 4m and a circular cross-sectional shape; change the distance between the borehole and the pile foundation in step D) to 5㎝, the distance between adjacent holes is changed to 80㎝, the number of holes is equal to 2π × [pillar radius 40㎝ + distance between drilling and pile foundation 5㎝] divided by the distance between adjacent holes That is, the arc length is 80 cm, and the formula is, Take four evenly distributed drill holes by rounding up, change the pressure of high-pressure water to 40MPa, change the pressure of compressed air to 0.8MPa, change the rotation speed of the high-pressure liquid injection pipe to 15rpm, and lift it up ( The speed of lifting) was changed to 0.2m / min; the diameter of the through hole on the slurry discharge pipe in step E) was changed to 0.5cm, and the distance between adjacent through holes was chan...
Example Embodiment
[0036] Example 3:
[0037] Only change the pile foundation in step A) to a steel pile with a diameter of 75cm and a length of 8m with a circular cross-sectional shape; change the distance between the borehole and the pile foundation in step D) to 7.5cm, The distance between adjacent drilling holes is changed to 65 cm, and the number of holes is equal to 2π × [pillar radius 37.5 cm + distance between drilling and pile foundation 7.5 cm] divided by the distance between adjacent drilling holes, that is, the arc length 65cm, the formula is, Take four evenly distributed drill holes by rounding up, change the pressure of high-pressure water to 20MPa, change the pressure of compressed air to 0.75MPa, and change the rotation speed of the high-pressure liquid injection pipe to 20rpm when it is lifted up, and it will be lifted upwards. The speed of (lifting) was changed to 0.225m / min; the diameter of the through hole on the slurry discharge pipe in step E) was changed to 0.75cm, and t...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap