Construction method for undisturbed soil pressure irrigation concrete pile with down-mounted pile top
A technology of undisturbed soil extraction and concrete pouring, which is applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems that the pile top soil laitance cannot be completely removed, and the pile body contains mud, so as to save labor costs and reduce waste , the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 3
[0088] Embodiment 3, in some cases, the hardness of the soil layer is relatively large, and it is necessary to carry out pilot hole drilling to loosen the hard soil layer. The specific construction process is as follows: a. Measure and locate, determine the center point of the concrete pile, and then use a special drilling rig to conduct the pilot hole; after the pilot hole, set the sheath tube around the center point; or bury the sheath tube first, and then lead the hole;
[0089] b. Place the sheath pipe vertically into the soil layer by means of vibration or pressing;
[0090] c. Align the center of the drill pipe with the pilot hole at the center point of the sheath pipe, and start drilling;
[0091] d. After drilling down to the design depth, first lift the drill pipe to the position where the drill bit valve can be opened, then start the concrete pump, pump concrete to the drill pipe through the pipeline, spray concrete from the lower end of the drill pipe, and continue ...