Oil extraction wastewater polymer preparation processing method
A technology for oil extraction sewage and treatment method, which is applied in mining wastewater treatment, water/sewage multi-stage treatment, water/sludge/sewage treatment, etc., can solve the problems of harsh operating conditions, high cost, and difficulty in equipment maintenance and use, etc. Achieve the effect of increasing initial viscosity and ensuring stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0039]The water quality of an oil production sewage is shown in Table 1. First, 15mg / L chlorine dioxide is added to the sewage. After 0.5h, the sewage enters the diatomite filter through the pump. The filtration rate of the filter is 3m / h, and the operating pressure is 0.2 mPa, the filtered sewage is used for ion exchange equipment, the resin is softened cathodic resin 001×7, the operating speed is 18m / h, the sewage after resin treatment is used to prepare polymer, the concentration of polymer solution is 1500mg / L, and the investigation is carried out at 80 ℃ Table 2 shows the initial viscosity of the prepared polymer solution and the stability of the solution viscosity within 30 days before and after oil production wastewater treatment.
[0040] Table 1 Experimental water quality
[0041] Analysis Project
Oilfield sewage
Treated Oilfield Sewage
Turbidity (NTU)
20.6
0.1
36
ND
pH
7.26
7.08
Co...
Embodiment 2
[0045] Take another certain oil production sewage, the water quality is shown in Table 3, first add 10mg / L chlorine dioxide to the sewage, after 1.0h, the sewage enters the diatomite filter through the pump, and the filtration rate of the filter is 2m / h. The operating pressure is 0.32mPa, and the filtered sewage is used for ion exchange equipment. The resin is softened cationic resin (001×7), and the operating speed is 15m / h. L, to investigate the initial viscosity of the prepared polymer solution before and after the treatment of oil production wastewater at 80°C and the stability of the solution viscosity within 25 days. The results are shown in Table 4.
[0046] Table 3 Experimental Water Quality
[0047] Analysis Project
Oilfield sewage
Treated Oilfield Sewage
Turbidity (NTU)
14.5
0.02
pH
7.58
7.43
Conductance (uS / cm)
7321
7601
Ca 2+ (mg / L)
161.0
0.4
Mg 2+ (mg / L)
103.2
ND
...
Embodiment 3
[0051] For the treatment of an oil extraction sewage, the water quality is shown in Table 5. First, 30mg / L chlorine dioxide is added to the sewage, and after 0.5h of action, it enters the diatomite filter. The filtration rate of the filter is 5m / h, and the operating pressure 0.40mPa, the filtered sewage is used for ion exchange equipment, the resin is softened cathodic resin (001×7), the operating speed is 20m / h, and the polymer is prepared from the sewage treated by the resin, and the concentration of the polymer solution is 1500mg / L. The initial viscosity of the prepared polymer solution and the stability of the solution viscosity within 30 days were investigated at 80°C before and after oil production wastewater treatment. The results are shown in Table 6.
[0052] Table 5 Experimental water quality
[0053] Analysis Project
Oilfield sewage
Treated Oilfield Sewage
Turbidity (NTU)
7.2
0.1
pH
8.58
7.18
Conductance (uS / cm)...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com