Asphalt particles with high softening point and preparation method for asphalt particles
A technology of high softening point bitumen and bitumen particles, which is applied in the field of petroleum bitumen to achieve good blocking effect, improved quality and strong deformation ability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] Take 100g of high softening point asphalt II (softening point is 180℃) and 70g of kerosene in a container, stir at room temperature (25℃) for 30 minutes, and prepare mother liquor after fully mixing; 60g high softening point asphalt I (softening point The temperature is 200℃, the average particle size is 60μm) and the mother liquor are mixed in the reactor, and compressed air is introduced. The gas inlet pressure is 0.15 MPa, the reactor temperature is kept at 180~190℃, stirred for 100 minutes, discharged, and cooled. High softening point asphalt mixture;
[0033] Add 100g low-temperature embrittlement high softening point asphalt mixture (low-temperature embrittlement conditions: temperature -25°C, time 8 hours), 4g hydrotalcite and 1.5g sodium lignosulfonate, add them to a high-speed crusher, mix and crush for 25s , Obtain high softening point asphalt particles, denoted as A1, with an average particle size of 85μm.
Embodiment 2
[0035] Take 100g high softening point asphalt II (softening point 220℃) and 50g diesel oil and put them in a container, stir at 50℃ for 30 minutes at room temperature, and prepare mother liquor after fully mixing; 100g high softening point asphalt I (softening point 250 ℃, the average particle size is 70μm) and the mother liquor are mixed in the reactor, and compressed air is introduced, the gas inlet pressure is 0.25 MPa, the reactor temperature is maintained at 230~240℃, stirred for 70 minutes, discharged, and cooled to obtain a high softening point Asphalt mixture
[0036] Add 100g of the low-temperature embrittlement high softening point asphalt composition (the embrittlement treatment conditions are the same as in Example 1), 5g graphite, 1g cetyltrimethylammonium bromide and 3g carboxymethyl starch are added to the high-speed pulverizer , Mix and pulverize for 20s to obtain high softening point asphalt particles, denoted as A2, with an average particle size of 100μm.
Embodiment 3
[0038] Take 100g of high softening point asphalt II (with a softening point of 170℃) and 100g of gasoline in a container, stir at 80℃ for 35 minutes at room temperature, and prepare mother liquor after fully mixing; 120g of high softening point asphalt I (softening point of 140 ℃, the average particle size is 70μm) and the mother liquor are mixed in the reactor, and compressed air is introduced. The gas inlet pressure is 0.3 MPa, and the reactor temperature is maintained at 150~160℃. Stir for 60 minutes, then heat to 165℃ and stir. 10 minutes, discharging and cooling to obtain high softening point asphalt mixture;
[0039] Add 100g of asphalt composition, 6g of montmorillonite and 0.5g of octadecyltrimethylammonium bromide to a high-speed pulverizer, mix and pulverize for 30s to obtain high softening point asphalt particles, denoted as A3, the average particle size It is 80μm.
PUM
| Property | Measurement | Unit |
|---|---|---|
| softening point | aaaaa | aaaaa |
| particle size | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More