A kind of preparation method of waste rubber pyrolysis conversion modified asphalt
A technology for modifying asphalt and waste rubber, used in building components, building insulation materials, buildings, etc., can solve the problems of large amount of asphalt mixing, difficult dispersion and settlement of rubber powder, and achieve excellent high and low temperature performance and improve compatibility. performance, improve performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Step 1: In terms of mass fraction, add 4 parts of SBS to 96 parts of 70#SK asphalt, and perform high-speed shearing at 170-190°C for 45 minutes, and the shearing speed is 3000r / min.
[0034] Step 2: Transfer the sheared SBS modified asphalt to a high-speed disperser and stir for 150 minutes at a stirring speed of 800-900r / min. During the process, add a total of 0.15 parts of sulfur to prepare modified asphalt.
[0035] The prepared modified asphalt is numbered 1, and its properties are shown in Table 1.
Embodiment 2
[0037]Step 1: Add 20 mesh waste tire whole rubber powder into the atmospheric pressure and high temperature double-screw desulfurization equipment, and at 300 ° C, after 20 minutes, the waste rubber is pyrolyzed into asphalt-like materials. In parts by mass, 30 parts of The waste rubber pyrolysis-like asphalt material and 70 parts of SK re-crossed asphalt were mixed in the asphalt tank to prepare the waste rubber pyrolysis and converted asphalt mother liquor. The mixing temperature was 160°C, the speed was 50r / min, and the time was 10min.
[0038] Step 2: Add 0.2% sulfur to the above mother liquor, at 170-190 ℃ Under the condition of high-speed shearing for 60min, the shearing speed is 4000r / min. The sheared modified asphalt is transferred to a high-speed disperser and stirred for 120 minutes, and the stirring speed is 800-900 r / min to obtain 40% waste rubber cracked and converted into asphalt.
[0039] The number of the obtained modified asphalt is 2, and the properties are ...
Embodiment 3
[0041] Step 1: Add 20 mesh waste tire whole rubber powder into the normal pressure and high temperature double-helix cracking equipment, and at 300 ° C, after 20 minutes, the waste rubber is pyrolyzed into asphalt-like materials. In parts by mass, 30 parts of waste rubber high-temperature cracking products and 70 parts of re-crossed asphalt were mixed in an asphalt tank to prepare a waste rubber cracking and converted asphalt mother liquor. The mixing temperature was 160 ° C, the rotating speed was 50 r / min, and the time was 10min.
[0042] Step 2: In terms of mass percentage, add 0.2% sulfur to the mother liquor, add 4% SBS, and perform high-speed shearing at 170-190° C. for 60 minutes, and the shearing speed is 4000 r / min. The sheared modified asphalt is transferred to a high-speed disperser for 120 minutes, and the stirring speed is 800-900 r / min to obtain the SBS modified waste rubber cracked and converted into asphalt.
[0043] The number of the obtained modified asphalt...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com