A treatment method for high-concentration ammonium sulfate industrial wastewater
A technology for industrial waste water and treatment methods, applied in natural water body treatment, water/sewage multi-stage treatment, water/sludge/sewage treatment, etc., can solve the problem of inability to directly and effectively treat biodegradable, poor ammonium sulfate concentration, high waste water and other issues, to achieve the effects of small footprint, reduced processing costs, and high efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0017] Specific embodiment one: a kind of processing method for high-concentration ammonium sulfate industrial wastewater of the present embodiment is carried out according to the following steps:
[0018] 1. Chlorination treatment: add sodium hypochlorite solution with a mass concentration of 10% to 20% to the raw water sample, so that the concentration of sodium hypochlorite in the raw water sample is 1g / L to 10g / L, and chlorination is obtained after stirring for 0.5h to 2h Water samples after treatment;
[0019] 2. Iron-carbon filler treatment: Add iron-carbon filler to the chlorinated water sample obtained in step 1, so that the chlorinated water sample is immersed in the iron-carbon filler, and then aerated for 1h to 4h to obtain the iron-carbon filler treated water. Sample;
[0020] 3. Oxidation treatment by Fenton method: add hydrogen peroxide with a mass concentration of 30% to 40% to the water sample after the iron-carbon filler treatment obtained in step 3, and then...
specific Embodiment approach 2
[0028] Embodiment 2: This embodiment differs from Embodiment 1 in that: the chemical composition and content of the iron-carbon filler described in step 2 is refined iron powder ≥ 75%, and the carbon content is 17% ± 1%. Others are the same as in the first embodiment.
specific Embodiment approach 3
[0029] Embodiment 3: This embodiment differs from Embodiment 1 or Embodiment 2 in that: in step 2, aeration is performed for 2 hours to obtain a water sample treated with iron-carbon filler. Others are the same as in the first or second embodiment.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


