Preparation method for SBS (styrene-butadiene-styrene block copolymer) modified asphalt waterproof material

A technology of waterproof material and modified asphalt, applied in building insulation materials, building components, buildings, etc., can solve the problems of low heat resistance and poor flexibility, and achieve good low temperature resistance, high wear resistance and good flexibility. Effect

Inactive Publication Date: 2017-05-31
SUZHOU YUXI NEW MATERIAL TECH
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0011] This application aims at the technical problems of poor flexibility and low heat resistance of existing SBS modified asphalt waterproofing materials, and provides a preparation method of SBS modified asphalt waterproofing materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] Weigh by weight: 100 parts of base asphalt; 80 parts of high-purity water; 10 parts of SBS; 25 parts of styrene-butadiene rubber; 4 parts of stearylamine polyoxyethylene ether; 8 parts of hydrochloric acid; 40 parts of toluene; 2 parts of ammonium chloride; 3 parts of polyoxyethylene nonyl phenyl ether; 0.2 parts of sulfur; 6 parts of polyethylene resin; 2 parts of calcium oxide; and 40 parts of carbon tetrafluoride.

[0026] Put the asphalt into a reactor equipped with a stirrer and a thermometer, heat it up to 170 ° C, and add SBS, styrene-butadiene rubber, stearylamine polyoxyethylene ether, hydrochloric acid, toluene and stearyl trimethyl after being melted, dehydrated and filtered. base ammonium chloride, stirred for 15 min, and the stirring speed was 800 rpm.

[0027] Add high-purity water while stirring, heat up to 200°C, add the remaining raw materials, mix for 40 minutes, then add the components after the second step stirring, add them to an emulsifier for emul...

Embodiment 2

[0030] Weigh by weight: 100 parts of base asphalt; 100 parts of high-purity water; 30 parts of SBS; 65 parts of styrene-butadiene rubber; 8 parts of stearylamine polyoxyethylene ether; 12 parts of hydrochloric acid; 80 parts of toluene; 8 parts of ammonium chloride; 7 parts of polyoxyethylene nonyl phenyl ether; 0.6 parts of sulfur; 10 parts of polyethylene resin; 6 parts of calcium oxide; 60 parts of carbon tetrafluoride.

[0031] Put the asphalt into a reactor equipped with a stirrer and a thermometer, heat it up to 190 ° C, add SBS, styrene-butadiene rubber, stearylamine polyoxyethylene ether, hydrochloric acid, toluene and stearyl trimethylene after being melted, dehydrated and filtered. base ammonium chloride, stirred for 55 min, and the stirring speed was 1200 rpm.

[0032] Add high-purity water while stirring, heat up to 220°C, add the remaining raw materials, mix for 80 minutes, then add the components after the second step stirring, add them to an emulsifier for emuls...

Embodiment 3

[0035] Weigh by weight: 100 parts of base asphalt; 85 parts of high-purity water; 15 parts of SBS; 35 parts of styrene-butadiene rubber; 5 parts of stearylamine polyoxyethylene ether; 9 parts of hydrochloric acid; 50 parts of toluene; 3 parts of ammonium chloride; 4 parts of polyoxyethylene nonyl phenyl ether; 0.3 parts of sulfur; 7 parts of polyethylene resin; 3 parts of calcium oxide; and 45 parts of carbon tetrafluoride.

[0036] Put the asphalt into a reactor equipped with a stirrer and a thermometer, heat it up to 170 ° C, and add SBS, styrene-butadiene rubber, stearylamine polyoxyethylene ether, hydrochloric acid, toluene and stearyl trimethyl after being melted, dehydrated and filtered. base ammonium chloride, stirred for 15 min, and the stirring speed was 800 rpm.

[0037] Add high-purity water while stirring, heat up to 200°C, add the remaining raw materials, mix for 40 minutes, then add the components after the second step stirring, add them to an emulsifier for emul...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a preparation method for an SBS (styrene-butadiene-styrene block copolymer) modified asphalt waterproof material. The method comprises the following steps of step1): weighting matrix asphalt, high purity water, SBS, butadiene styrene rubber, N-Polyoxyethylated-N-octadecylamine, hydrochloric acid, methylbenzene, stearic trimethyl ammonium chloride, polyoxyethylene nonyl phenyl ether, sulphur, polyethylene resin, calcium oxide and carbon tetrafluoride; step2): adding the matrix asphalt into a reaction still provided with a stirrer and a thermometer, heating to 170 to 190 DEG C, adding the SBS, the butadiene styrene rubber, the N-Polyoxyethylated-N-octadecylamine, the hydrochloric acid, the methylbenzene, the stearic trimethyl ammonium chloride after melting, dehydration and filtering, stirring for 15 to 55min with the stirring speed of 800 to 1200r/min; step3): adding the high purity water while stirring, heating to 200 to 220 DEG C, adding residual raw materials for mixing 40 to 80min, then adding the components stirred in the step2) to obtain a mixture, adding the mixture into an emulsifying machine to perform emulsification, cooling to 30 to 40 DEG C and defoaming to obtain the SBS modified asphalt waterproof material. The method disclosed by the invention has the advantages that the process is simple, the equipment invest is small, the energy is saved and the consumption is reduced.

Description

technical field [0001] The invention belongs to the technical field of asphalt materials, and in particular relates to a preparation method of an SBS modified asphalt waterproof material. Background technique [0002] Add SBS (styrene-butadiene-styrene block copolymer) to ordinary asphalt to form asphalt mixed with SBS through shearing, stirring, etc., to improve the road performance of asphalt, and improve the strength, toughness, High and low temperature performance, anti-water damage, anti-skid, anti-aging, anti-fatigue ability, prolong the life of asphalt pavement. [0003] Asphalt modifiers are natural or synthetic organic or inorganic materials added to asphalt or asphalt mixtures, which can be melted or dispersed in asphalt to improve or improve the road performance of asphalt. For example, in order to improve the mechanical properties of asphalt (strength and toughness, etc.), polymers, resins, plastics, carbon black, inorganic salts and other materials that increas...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): C08L95/00C08L53/02C08L9/06C08L71/02C08L23/06C08K13/02C08K5/19C08K3/22C08K3/06
CPCC08L95/00C08L2201/08C08L2205/025C08L2205/035C08L53/02C08L9/06C08L71/02C08L23/06C08K13/02C08K5/19C08K2003/2206C08K3/06
Inventor 杨阳
Owner SUZHOU YUXI NEW MATERIAL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products