PAH-Heavy Metal Contaminated Soil Remediation Method
A technology for polycyclic aromatic hydrocarbons and polluted soil, applied in the field of environmental engineering, can solve the problems of complexity, less research, complex pollution effect and mechanism.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] Take the soil 0-1.5m below the stratum in the uncontaminated area, air-dry it naturally after removing debris, mash it into powder, and pass it through a 60-mesh sieve for later use. Take 1.0kg of soil and a certain volume of Cu(NO 3 ) 2 -Cd(N0 3 ) 2 The solution was mixed, stirred fully, air-dried naturally, passed through a 60-mesh sieve, and moved to a brown airtight container to stand for aging for a week to obtain Cu / Cd composite polluted soil; then, pour methanol with a certain amount of phenanthrene dissolved in the Cu / Cd composite polluted soil , stir evenly, air-dry in a fume hood, pass through a 60-mesh sieve, and move to a brown airtight container to stand for aging for a week to obtain Cu / Cd-phenanthrene composite polluted soil, in which the concentrations of Cu and Cd are 500 mg / kg, and the concentration of phenanthrene is 500 mg / kg. 100mg / kg.
[0028] Take the soil 0-1.5m below the stratum in the uncontaminated area, air-dry it naturally after removing...
Embodiment 2
[0034]Contaminated soil near a smelter (2549mg / kg Pb, 26mg / kg Cd, 973mg / kg Zn, 45mg / kg phenanthrene). Install the rinsing pipeline system on the ground surface, the upper edge of the pipeline is equal to the ground surface, and the volume ratio is 3:1 5000ml / L N-lauroyl ED3A solution and 200mg / L chitosan solution are compounded through the control of the solenoid valve The leaching agent enters the contaminated soil through the micropores on the rinsing pipeline system under the action of the booster pump. The leaching time is about 24 hours, and the water-to-soil ratio is about 30:1; Vacuum suction pump extraction collection.
[0035] According to the weight ratio of chitosan, sodium lignin sulfonate, iron oxide and activated carbon is 2: 2: 6: 3 to prepare soil in-situ remediation agent, apply 1.5cm of soil in-situ remediation agent on the soil surface after leaching; Mix the leached soil 25cm thick from the surface with the applied soil in-situ remediation agent by plowing...
Embodiment 3
[0038] The soil in a sewage irrigation area contained 86.8mg / kg Cu, 174.9mg / kg Zn, 3.52mg / kg Cd, 94.5mg / kg Cr, 15mg / kg anthracene, and 9mg / kg phenanthrene. Install the rinsing pipeline system on the surface, and the upper edge of the pipeline is equal to the surface, and the 7000ml / L N-dodecanoyl ED3A solution and the 260mg / L chitosan solution with a volume ratio of 4:1 are compounded by a solenoid valve Under the action of the pressurized pump, the eluent enters the contaminated soil through the micropores on the leaching pipeline system. The leaching time is about 24 hours, and the water-to-soil ratio is about 10:1. Vacuum suction pump extraction collection.
[0039] According to the weight ratio of chitosan, sodium lignosulfonate, iron oxide and activated carbon is 1: 2: 6: 2 to prepare soil in-situ remediation agent, apply 1.0cm of soil in-situ remediation agent on the soil surface after leaching; Mix the washed soil 20cm thick from the surface with the applied soil in-si...