Top pipe grouting reinforcing construction method
A technology of grouting reinforcement and construction method, which is applied in the field of building construction and pipe jacking construction, and can solve the problems of loss and waste, loss of grouting materials and grouting, pipeline consolidation and adhesion, etc., to avoid loss and waste, easy to operate, The effect of speeding up the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] At the nozzle 2 of the pipe jacking 1, a lime-sand brick brick wall is used as the closed wall 3, and the nozzle 2 is sealed through the brick wall; when the brick wall is laid, a drain hole 4 and a valve switch are reserved in the center of the brick wall; After the wall reaches a certain strength, use a pneumatic drill to drill out the grouting hole 5 (which can be arranged in a plum blossom shape) on the brick wall. The diameter of the drilled hole is 3 mm larger than the diameter of the advanced small conduit and the locking foot anchor pipe that need to be arranged in the grouting hole 5 ; After the drilling is completed, install the advanced small conduit and the lock-foot anchor pipe in time to avoid hole collapse; the jacking of the advanced small conduit and the lock-foot anchor pipe adopts the combination of large hole guidance and pneumatic drilling, that is, first drill larger than the advance small conduit Use the punching force and thrust of the drilling ri...
Embodiment 2
[0063] At the pipe opening 2 of the pipe jacking 1, a lime-sand brick brick wall is used as a closed wall 3, and the pipe opening 2 is sealed through the brick wall; after the brick wall reaches a certain strength, a drain hole 4 is drilled in the center of the brick wall with a pneumatic drill And install the valve switch in the drain hole 4; Drill out the grouting hole 5 (can be arranged in a quincunx shape) with a pneumatic drill at other positions of the brick wall, and the diameter of the drill hole is greater than the grouting sleeve valve that needs to be arranged in the grouting hole 5 The diameter of the pipe is 5mm; after the drilling is completed, install the grouting sleeve valve pipe in time to avoid collapse; the jacking of the grouting sleeve valve pipe adopts the combination of large hole guidance and pneumatic drilling, that is, first drill larger than the grouting sleeve valve pipe diameter guide hole, use the punching force and thrust of the drilling rig to p...
Embodiment 3
[0067] At the pipe opening 2 of the pipe jacking 1, a lime-sand brick brick wall is used as a closed wall 3, and the pipe opening 2 is sealed through the brick wall; after the brick wall reaches a certain strength, a drain hole 4 is drilled in the center of the brick wall with a pneumatic drill And install the valve switch in the drain hole 4; Drill out the exhaust hole 6 (can be arranged at intervals along the circumferential direction of the nozzle 2) and install the exhaust pipe in the exhaust hole 6 at other positions of the brick wall Drill out the grouting hole 5 (can be arranged in a quincunx shape) with an air drill at another position of the brick wall, and the diameter of the borehole is greater than the diameter 4mm of the grouting sleeve valve pipe that needs to be arranged in the grouting hole 5; Install the grouting sleeve valve pipe to avoid collapse holes; the jacking of the grouting sleeve valve pipe adopts the combination of large hole guidance and pneumatic d...