Production and heat-supply system for biomass charcoal

A heating system and biomass charcoal technology, which is applied in the fields of biofuel, waste fuel, direct heating and dry distillation, etc., can solve the problems of unreasonable utilization of flue gas, long production cycle, large energy consumption, etc., and achieve safe, convenient and instant utilization. , the effect of long burning time and high economic value

Pending Publication Date: 2018-06-05
浏阳市金仁林业集团有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Most of the current production practices still use the traditional earth kiln charcoal firing process to produce biomass charcoal. It takes 10-15 days from kiln installation to charcoal discharge. T

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Production and heat-supply system for biomass charcoal
  • Production and heat-supply system for biomass charcoal
  • Production and heat-supply system for biomass charcoal

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0018] Referring to the accompanying drawings, reflecting a specific structure of the present invention, the biomass charcoal production and heating system includes sixteen kiln bodies 201 arranged in a matrix of 4 rows×4 columns, and the kiln bodies 201 are opened on the ground 200 Below the cellar structure. The spacing between each kiln body is 40-50 cm. A pre-combustion and heat-conducting tunnel 205 is set between the two rows of kiln bodies 201, and one end of the two pre-combustion and heat-conducting tunnels 205 is connected to the general heat-conducting tunnel 206. Two heat supply pipes 209 , the first heat supply pipe 210 is connected to the furnace of the gas boiler 212 , and the second heat supply pipe 209 is connected to the heater of the preheating water tank 211 of the gas boiler 212 . The combustible gas in the carbonization process is acted by the boiler furnace fan, and enters the gas boiler furnace through the pre-combustion heat conduction tunnel, the tot...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a production and heat-supply system for biomass charcoal. The production and heat-supply system comprises a plurality of cellar type kiln bodies which are distributed in a matrix manner, wherein a pre-combusting heat-conducting pit channel is formed between two rows of kiln bodies. Combustible gas is influenced by a boiler fan in the carbonization process and enters a fuelgas hearth or a pre-heating water heating mechanism sequentially through the pre-combusting heat-conducting pit channel, a total heat-conducting pit channel, a split-flow door and a heat supply pipeline; the combustible gas is ignited in the pre-combusting heat-conducting pit channel, so as to realize decompression and explosion protection; by utilizing a cellar type structure, relatively good thermal insulation effect and airtight effect are achieved on the premise that the manufacturing cost is low; the energy consumption is substantially reduced; the quality of charcoal is greatly improved;the environmental pollution is completely eradicated, and the instant utilization of carbonized gas is safely and conveniently realized; and the system scale is convenient to be flexibly adjusted.

Description

technical field [0001] The invention relates to a heating system using combustible gas produced in the production process of biomass charcoal. Background technique [0002] Forestry waste such as branches, bark, wood processing scraps, firewood, twig firewood, curly bark, shavings, sawdust, etc., after crushing and crushing, the sawdust is hot-pressed into rods with rod-making equipment, and the rods are carbonized The prepared charcoal is called biochar or machine-made charcoal. Most of the current production practices still use the traditional earth kiln charcoal firing process to produce biomass charcoal. It takes 10-15 days from kiln installation to charcoal discharge. The production cycle is long, energy consumption is large, and the flue gas in the charcoal production process has not been rationally utilized. , and discharge into the air causing serious pollution. Contents of the invention [0003] The purpose of the present invention is to provide a compound syste...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): C10B53/02C10B49/02C10L5/44
CPCC10B49/02C10B53/02C10L5/442C10L2230/22Y02E50/10Y02E50/30
Inventor 江秋文罗诗权徐良勇
Owner 浏阳市金仁林业集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products