Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A dt-bim-based information fusion management system and method for fabricated prefabricated components

A DT-BIM, prefabricated component technology, applied in the field of building construction, can solve problems such as affecting production progress, rework or temporary adjustment of production components, and difficulty in refined management of prefabricated components, so as to eliminate information islands, realize joint management, improve The effect of management efficiency and production efficiency

Active Publication Date: 2022-01-25
NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] With the implementation of industrialization, the two-dimensional plan can no longer meet the needs of construction units, especially for complex components. Problems such as difficult docking and professional construction ability training are difficult, resulting in rework or temporary adjustments during the production of components, affecting production progress
Although building information modeling (BIM) technology is used in the prior art for three-dimensional modeling and construction simulation of prefabricated components to solve the above-mentioned technical problems, the actual production of prefabricated components is prone to flaws, which leads to failure of prefabricated components in accordance with There are many quality problems in the production of normal processes and the production of prefabricated components

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A dt-bim-based information fusion management system and method for fabricated prefabricated components

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] In the following, a preferred embodiment of the present invention will be used to describe the specific implementation of the present invention, but the implementation and protection of the present invention are not limited thereto.

[0044] Such as figure 1 As shown, a DT-BIM-based prefabricated component information fusion management system includes BIM modeling service subsystem 1, DT production management subsystem 2, big data joint subsystem 3, and tracking and positioning subsystem 4;

[0045] The BIM modeling service subsystem 1 includes a component modeling module 10, an optimization and adjustment module 11, a dynamic simulation module 12, and a model output module 13. The component modeling module 10 is used to use BIM technology to carry out three-dimensional modeling of prefabricated components; the optimization and adjustment module 11 is used for collision detection of the 3D model of prefabricated components; dynamic simulation module 12 is used for dynam...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a DT‑BIM-based assembly prefabricated component information fusion management system and method, the system includes a BIM modeling service subsystem, which is used to perform three-dimensional modeling, optimization and dynamic construction of prefabricated components using BIM technology Simulation and prefabricated component model information output; DT production management subsystem is used to realize the virtual-real mapping and virtual workshop of the physical workshop and virtual workshop through the two-way data connection between the workshop service module and the physical workshop module and virtual workshop module. Real-time interaction; big data joint subsystem, used to access, store and fuse data; tracking and positioning subsystem, used to encode prefabricated component model information, generate identity tags, and perform information tracking. In a word, the present invention effectively integrates multi-source data, eliminates isolated information islands, and realizes upstream and downstream joint management, thereby improving management efficiency and production efficiency as a whole.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a DT-BIM-based information fusion management system and method for assembled prefabricated components. Background technique [0002] At this stage, the country is vigorously promoting the industrialization of housing, which refers to the construction of housing by means of industrialized production, that is, the construction of prefabricated concrete component systems. Compared with the previous wet work, the prefabricated building construction has improved the construction efficiency to a certain extent. [0003] Prefabricated buildings refer to buildings assembled on site with prefabricated components. Its main features are standardization of design, factory production, mechanization of construction, integration of mechanical and electrical decoration, and informationization of management. With the development of modern industrial technology, building...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/10G06Q50/08G06F16/25
CPCG06Q10/103G06Q50/08
Inventor 郑惠军武宗良牛锦超
Owner NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products