Drilling method for improving low rate of penetration in shale reservoirs
A shale reservoir and drilling speed technology, which is applied in the field of improving the low drilling speed of shale reservoirs, can solve the problems of slow drilling time and low drilling speed, and achieve the elimination of debris accumulation, friction reduction, The effect of increasing drilling speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 The shown drilling method for improving the low drilling speed of shale reservoirs is characterized in that it comprises the following steps:
[0028] (a) Use the PDC bit to drill to a vertical depth of 5-10m from the top of the shale reservoir according to the designed wellbore trajectory. During the drilling process, the viscosity of the drilling fluid is A, in centipoise; the density is B, in g / cm 3 ;Statistics The average drilling speed in the last 24 hours during the drilling process is X, the unit is m / h; the average speed of the drill pipe is Y, the unit is rpm; the average drilling pressure is Z, the unit is ton; the average displacement is Q, the unit is L / min ; Cycle, trip out, replace the bit with a tricone bit equal in diameter to the PDC bit, and use a new screw drilling tool in the BHA;
[0029] (b) Drill down to the bottom of the well, explore sand, drill into the shale reservoir, continue drilling with the speed Y, weight on bit Z, an...
Embodiment 2
[0035] Such as figure 1 The shown drilling method for improving the low rate of penetration of shale reservoirs, on the basis of Example 1, the displacement when replacing heavy slurry and thick slurry in step (d) is Q', and the Q' / Q=0.6; after the thick slurry is completely returned from the wellhead, increase the displacement to Q again. The displacement when replacing the slurry in step (e) is Q", said Q" / Q=1.4; after the slurry is completely returned from the wellhead, reduce the displacement to Q again. The slurry returns from the wellhead, and after the cuttings are screened out by the vibrating screen, it no longer enters the drilling fluid circulation pool. After the slurry is screened out of cuttings by a vibrating sieve, it enters a waste oil tank for recovery.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com