An industrial control safety shooting range platform and method
A safe and shooting range technology, applied in the direction of comprehensive factory control, comprehensive factory control, program control, etc., can solve the problems of high maintenance cost, low efficiency, and difficult expansion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like Figure 1 Indicated. The present disclosure provides a method of industrial safety and platform range, safety range industrial platform to build a simulated city water affairs the SCADA (Supervisory Control and Data Acquisition) system, produced by the target environment layer, control layer and a monitoring field control layer, including rapid water distribution simulation module, analog PLC (programmable logic controller) module, an analog MTU (primary terminal unit) module, an analog HMI (Human Machine interface) module, and a communication network connecting the industrial Ethernet module. It can be used for industrial security offensive and defensive drills, product safety testing, risk assessment and safety obtain experimental data related to scientific research. The present disclosure by introducing real-time simulation of the water distribution system to the field of industrial safety simulation experiments, increased industrial safety range of target scene to s...
Embodiment 2
[0052] The present disclosure further provides a method of using the above-described embodiment employed industrial safety range platform, comprising:
[0053] Industrial safety range simulation target scene by the target production environment layer, a pre-simulation using simulation data generation processing performed in the object scene;
[0054] By monitoring the control process simulation data and generating layer data or adjust the profile;
[0055] By field control layer collected and transmitted to the simulation data monitoring control layer, the adjustment data or acknowledgment information to the target production environment layer.
[0056] Pre-processing step of performing simulation comprises:
[0057] After production target layer simulation data transmission, in accordance with the next step the simulation data simulated data generated in advance, and the next cache simulation results;
[0058] When receiving the acknowledgment message, the simulation results of t...
Embodiment 3
[0076] The construction method of the industrial control safety target field platform based on the above embodiment is as follows:
[0077] Constructing a fast-output water simulation module, constructing a network model according to the target production environment and simulation requirements of the urban water system to be simky;
[0078] Building an analog PLC module, analog PLC module includes a client terminal module communicating with a fast-host water simulation module and a service terminal module that communicates with an analog MTU / analog HMI;
[0079] Building analog MTU module, analog MTU module includes a control sub-module implemented based on control logic and a client terminal module that communicates with an analog PLC, wherein the control sub-module is based on the simulation data collected from the analog PLC and the control logic to the output water simulation system. The pipe network parameters are adjusted;
[0080] Building an analog HMI module, analog HM...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


