Filling separation wall construction method
A separation wall and trolley technology, which is applied in the fields of filling, earthwork drilling, mining equipment, etc., can solve the problems of complex construction process, long construction period, poor safety, etc., to reduce costs, improve construction efficiency, and increase stability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] like Figure 1-4 As shown, a filling partition wall construction trolley includes a main control system, a power supply system, a driving system located in the middle of the trolley, and a mixing drum 19, an accelerator silo 11, a cement silo 15, The air compressor 9 and the clamping device and the pouring device at the front end of the trolley; wherein, the main control system is integrated on the console 1 in the cab 2, and the programmable logic controller (PLC) realizes The equipment is detected and called; the power supply system provides power for each equipment of the entire trolley; the mixing barrel 19 is symmetrically arranged with the accelerator silo 11, and the cement silo 15 is located on the rear side of the mixing barrel 19 and the accelerator silo 11, wherein The upper side of the mixing bucket 19 is connected to the tailings conveying pipe 7, and the other end of the tailings conveying pipe 7 is connected to the filling slurry pipe; the bottom of the m...
Embodiment 2
[0067] A method for quickly, safely and efficiently constructing a filling and separating wall by using the above-mentioned filling and separating wall construction trolley, the method comprising the following steps:
[0068] (1) When the main power switch of the filling partition wall construction trolley is turned on, the trolley enters the self-checking state to check the status of each sensor. When the self-checking is completed, the trolley is in the waiting state;
[0069] (2) Drive the filling partition wall construction trolley to the work site, operate the hydraulic support 4 to keep the trolley stable, and carry out the preparatory work before the filling partition wall construction;
[0070] (3) Sand extraction work: the tailings conveying pipe 7 is connected to the filling slurry pipe, the operation console 1 controls the opening of the pinch valve 8 through electronic signals to carry out the sand extraction operation, and the tailings pass through the filling slur...