Process flow and equipment for producing cement clinker by high-temperature molten-state slag
A high-temperature melting and cement clinker technology, applied in clinker production, cement production, etc., can solve problems such as heat pollution, waste of water resources, and inability to use cement clinker, so as to save mine resources, reduce energy consumption, and protect the environment. obvious effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] The technological process of producing cement clinker from high-temperature molten slag is to install a liquid slag heat preservation slag storage tank at the slag outlet of the smelting furnace, store the liquid slag in the liquid slag heat preservation slag storage tank, transport it to the reaction tank by a trolley and prepare it Iron powder, carbide slag and clay or fly ash are mixed, and after the temperature is adjusted by the system, they are pre-combined with iron powder, carbide slag and clay or fly ash; the obtained material is liquid clinker, and the online detection value conforms to the product quality After controlling the standard, the qualified liquid clinker is sent to the rotary kiln for compounding, cooling, and solidification to 1350°C, and is quenched by the cooler to become solid clinker. After the temperature of the solid clinker is reduced to 650°C, it is slowly cooled to ambient temperature At 65°C, the solid clinker is transported to the clinke...
Embodiment 2
[0027]The process flow for producing cement clinker from high-temperature molten slag, the reaction temperature of the liquid slag and iron powder, carbide slag and clay or fly ash is controlled between 1500°C-1200°C; the iron The preheating temperature of powder, carbide slag and clay or fly ash is adjusted in the range of 600-1100 ° C; the solidification cooling granulation temperature of the solidified clinker is controlled in the interval of 1350-1280 ° C; the solidification The final cooling temperature of the clinker is ambient temperature plus 25° C.; the cooling medium for the solidified clinker is two fluids of air and steam, and the steam is superheated steam or saturated steam or unsaturated steam.
Embodiment 3
[0029] The above-mentioned special equipment for producing cement clinker from high-temperature molten slag comprises: a smelting furnace 1, the smelting furnace 1 is connected to a conveying tower 4 equipped with a liquid slag heat preservation slag storage tank 3, and the conveying tower 4 is connected to A reaction tank 5, the reaction tank 5 is connected to the rotary kiln 6, the rotary kiln 6 is connected to the cooler 7, the cooler 7 is connected to the conveyor 8, the air outlet of the rotary kiln and the outlet of the cooler The tuyere is connected to the waste heat power station 9 at the same time, the conveyor 8 is connected to the clinker storage 10 , and the smelting furnace has a slag outlet 2 .
[0030] The special equipment for producing cement clinker from high-temperature molten slag, the liquid reactant after the pre-combination reaction in the reaction tank is completed in the rotary kiln, cooled, solidified and granulated; and can control Special equipment ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com