Color microsurface based on undertint emulsified asphalt and preparation method thereof
A technology for emulsified asphalt and micro-surface, which is applied in the field of colored micro-surface based on light-colored emulsified asphalt and its preparation, and achieves the effects of facilitating construction and use, reducing production costs, and cheap raw materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] A kind of color micro-surfacing based on light-colored emulsified asphalt, which is first extracted from 50kg of furfural oil, 3kg of styrene-butadiene-styrene block copolymer, 37kg of petroleum resin, and 2kg of ethylene-acetic acid Ethylene copolymer and 1 kg of dioctyl phthalate are cut to make material A; take 2 kg of stearic acid diethanolamide and 96.3 kg of water and mix and stir evenly to make material B; then take the above prepared material A 30kg and 70kg of material B are sheared by a colloid mill to make light-colored emulsified asphalt; finally, 10kg of light-colored emulsified asphalt, 74.5kg of stone, 1kg of inorganic pigment, 8kg of water, and 1kg of cement are mixed and stirred evenly.
[0029] A kind of preparation method based on the color micro-surfacing of light-colored emulsified asphalt, described preparation method comprises the steps:
[0030] Step 1: Preparation of material A: first the stirring equipment is cleaned up, then add 50kg of furfur...
Embodiment 2
[0035] A kind of color micro-surfacing based on light-colored emulsified asphalt, which is first extracted from 55kg of furfural oil, 4kg of styrene-butadiene-styrene block copolymer, 45kg of petroleum resin, and 3kg of ethylene-acetic acid Ethylene copolymer and 1 kg of dioctyl phthalate are cut to make material A; take 3 kg of stearic acid diethanolamide and 97.3 kg of water and mix and stir evenly to make material B; then take the above prepared material A 40kg and 60kg of material B are cut into light-colored emulsified asphalt by colloid mill; finally, 12kg of light-colored emulsified asphalt, 80kg of stone material, 2kg of inorganic pigment, 10kg of water, and 1.5kg of cement are mixed and stirred evenly.
[0036] A kind of preparation method based on the color micro-surfacing of light-colored emulsified asphalt, described preparation method comprises the steps:
[0037] Step 1: Preparation of material A: first the mixing equipment is cleaned up, then the furfural extrac...
Embodiment 3
[0042] A kind of color micro-surfacing based on light-colored emulsified asphalt, it is firstly taken 53kg of furfural extract oil, 3.5kg of styrene-butadiene-styrene block copolymer, 40kg of petroleum resin, 2.5kg of ethylene - The dioctyl phthalate of vinyl acetate copolymer, 1kg is cut to make A material; Get the stearic acid diethanolamide of 2.5kg, the water mixing and stirring of 97kg makes B material; Then take the above-mentioned preparation 35kg of material A and 65kg of material B are cut into light-colored emulsified asphalt by a colloid mill; finally, 11kg of light-colored emulsified asphalt, 76kg of stone materials, 1.5kg of inorganic pigments, 9kg of water, and 1.2kg of cement are mixed and stirred evenly. to make.
[0043] A kind of preparation method based on the color micro-surfacing of light-colored emulsified asphalt, described preparation method comprises the steps:
[0044] Step 1: Preparation of material A: first the mixing equipment is cleaned up, then ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 