Joint filling glue for road maintenance and preparation method thereof
A technology of road maintenance and caulking glue, which is applied in the direction of roads, roads, adhesives, etc., can solve the problems of unsatisfactory repair effect, poor high temperature stability, high maintenance cost, etc., and achieve good adhesion, excellent low temperature crack resistance, excellent physical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] Raw materials: 94kg 70# matrix asphalt, 6kg styrene-butadiene-styrene block copolymer, 8kg minus four-line extraction oil, 3kg rubber powder, 3kg polyolefin, 2kg styrene-butadiene rubber, 3kg phthalate, 2kg waste engine oil, 2kg diatomaceous earth.
[0022] The above raw materials are operated according to the following steps: Preheat 70# base asphalt to 150°C, add styrene-butadiene-styrene block copolymer, four-line extraction oil, and styrene-butadiene rubber to the base asphalt and stir for 20 minutes , 4000r / min high-speed shearing at 170°C for 30 minutes, then add phthalate, waste engine oil, rubber powder, polyolefin, diatomaceous earth, and stir evenly to obtain road maintenance gap filler.
Embodiment 2
[0024] Raw materials: 100kg 70# matrix asphalt, 10kg styrene-butadiene-styrene block copolymer, 2kg polyolefin, 10kg minus four-line extraction oil, 2kg diatomaceous earth.
[0025] The above raw materials are operated according to the following steps: Preheat 90# base asphalt to 150°C, add styrene-butadiene-styrene block copolymer, polyolefin, and four-line extraction oil to the base asphalt and stir for 20 minutes, 170 Under 4000r / min high-speed shearing for 30 minutes at ℃, then add diatomaceous earth and stir evenly to obtain road maintenance gap filler.
Embodiment 3
[0027] Raw materials: 100kg 90# matrix asphalt, 4kg styrene-butadiene-styrene block copolymer, 6kg minus four-line extraction oil, 4kg rubber powder, 1.5kg styrene-butadiene rubber, 1.5kg phthalate, 1.5kg Waste engine oil, 1.5kg diatomaceous earth.
[0028] The above raw materials are operated according to the following steps: Preheat 90# base asphalt to 150°C, add styrene-butadiene-styrene block copolymer, four-line extraction oil, and styrene-butadiene rubber to the base asphalt and stir for 20 minutes , 4000r / min high-speed shearing at 170°C for 30 minutes, then add phthalate, waste engine oil, rubber powder, diatomaceous earth, and stir evenly to obtain road maintenance joint sealant.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com