Production material and process for internal combustion engine cylinder body and cylinder cover with light weight and high thermal fatigue strength
A technology with high thermal fatigue and high strength, used in manufacturing tools, metal processing equipment, casting and molding equipment, etc., can solve the problems of heavy weight, high cost, low thermal fatigue strength, etc., and achieve reduced weight, good surface quality, and thermal fatigue. high intensity effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0007] A production process of an internal-combustion engine cylinder head with light weight and high thermal fatigue strength, which comprises the following process steps:
[0008] (1) Pre-expanding polystyrene beads, pre-expanding EPS beads under the conditions of air pressure of 0.4MPa, steam temperature of 85°C, and foaming density of 22g / L;
[0009] ⑵Mature the pre-released polystyrene beads, keep the area of the curing warehouse ventilated, and the curing time is 4 hours;
[0010] ⑶White mold forming, preheat the mold to 50°C, keep mold clamping, feeding, and steam pressure at 0.4MPa, and control the time at 50s;
[0011] ⑷White mold drying, drying the white mold at a temperature of 50°C;
[0012] ⑸White mold combination, apply cold glue or hot melt glue to the parting surface of the model;
[0013] ⑹ Fill sand, fill the semi-closed channel cavity with coated sand;
[0014] ⑺ Brush the surface of the white mold with lost foam casting refractory coating, and the thic...
Embodiment 2
[0021] A production process of an internal-combustion engine cylinder head with light weight and high thermal fatigue strength, which comprises the following process steps:
[0022] (1) Pre-expanding polystyrene beads, pre-expanding EPS beads under the conditions of air pressure of 0.5MPa, steam temperature of 90°C, and foaming density of 23g / L;
[0023] ⑵Mature the pre-released polystyrene beads, keep the area of the curing warehouse ventilated, and cure for 5 hours;
[0024] ⑶White mold forming, preheat the mold to 60°C, keep mold clamping, feeding, and steam pressure at 0.5MPa, and control the time at 60s;
[0025] ⑷Drying the white mold, drying the white mold at a temperature of 53°C;
[0026] ⑸White mold combination, apply cold glue or hot melt glue to the parting surface of the model;
[0027] ⑹ Fill sand, fill the semi-closed channel cavity with coated sand;
[0028] ⑺ Brush the surface of the white mold with lost foam casting refractory coating, and the thickness ...
Embodiment 3
[0035] A production process of an internal-combustion engine cylinder head with light weight and high thermal fatigue strength, which comprises the following process steps:
[0036] (1) Pre-expanding polystyrene beads, pre-expanding EPS beads under the conditions of air pressure of 0.6MPa, steam temperature of 100°C, and foaming density of 26g / L;
[0037] ⑵Mature the pre-released polystyrene beads, keep the area of the curing warehouse ventilated, and the curing time is 6 hours;
[0038] ⑶ White mold forming, preheat the mold to 70°C, keep mold clamping, feeding, and steam pressure at 0.6MPa, and control the time at 70s;
[0039] (4) Drying of the white mold, drying the white mold at a temperature of 55°C;
[0040] ⑸White mold combination, apply cold glue or hot melt glue to the parting surface of the model;
[0041] ⑹ Fill sand, fill the semi-closed channel cavity with coated sand;
[0042] ⑺ Brush the surface of the white mold with lost foam casting refractory coating, ...