Chain wheel for VVT system and preparation method of chain wheel
A sprocket and sprocket tooth technology, which is applied in the field of VVT system sprocket and its preparation, can solve problems such as low production efficiency, oil leakage, and performance impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1)
[0027] See figure 1 , figure 2 and image 3 , the sprocket of the VVT system includes the outer sprocket 1 of the flange, the stator 2 composed of the middle part of the flange and the BOSS part. The sprocket is a powder metallurgy product, and its powder metallurgy component (mass percentage) is C: 0.6-0.9%, Cu: 2.25-2.75%, the rest is Fe and unavoidable impurities.
[0028] The sprocket of the VVT system has high precision. The main parameters are: the density of the flange teeth is controlled at 7.05-7.15g / cm3, the overall density is 7.0g / cm3-7.2g / cm3; the hardness of the teeth is 460-650HV5, and the surface hardness of the substrate is HRB70 MIN ;
[0029] The flatness of the upper and lower end surfaces is ≤0.01MM; the parallelism of the upper and lower end surfaces is ≤0.015MM; the perpendicularity of the lower end to the large inner diameter of the center is ≤0.015MM; the coaxiality of the large and small inner diameters of the center is ≤0.05MM.
[0030] (Exam...
Embodiment 2)
[0049] A preparation method for a sprocket of a VVT system, comprising the following steps:
[0050] (1) Mixing: Design raw material composition and mixing, and mix the following raw materials evenly according to mass percentage: C: 0.9%, Cu: 2.25%, and the rest is Fe and unavoidable impurities;
[0051] (2) Forming: Select a 500Ton CNC forming press, put the prepared powder metallurgy raw materials into the mold of the forming machine and press them into shape. The density of the green body is evenly divided, and the density of the teeth of the sprocket flange is controlled at 7.15g / cm3, and the overall density 7.10g / cm3, at the same time the green body is automatically deburred after demoulding;
[0052] (3) Sintering: Put the formed green body into a high-temperature mesh belt furnace for sintering. The green body is preheated for 10 minutes, then kept at 1120°C for 45 minutes, and finally cooled gradually to room temperature under a protective atmosphere. The sintering atm...
Embodiment 3)
[0067] A preparation method for a sprocket of a VVT system, comprising the following steps:
[0068] (1) Mixing: Design raw material composition and mixing, and mix the following raw materials evenly according to mass percentage: C: 0.8%, Cu: 2.50%, and the rest is Fe and unavoidable impurities;
[0069] (2) Forming: Select a 500Ton CNC forming press, put the prepared powder metallurgy raw materials into the mold of the forming machine and press them into shape. The density of the green body is evenly divided, and the density of the teeth of the sprocket flange is controlled at 7.10g / cm3, and the overall density 7.0g / cm3, at the same time the green body is automatically deburred after demoulding;
[0070] (3) Sintering: Put the formed green body into a high-temperature mesh belt furnace for sintering. The green body is preheated for 8 minutes, then kept at 1130°C for 45 minutes, and finally cooled gradually to room temperature under a protective atmosphere. The sintering atmos...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Density | aaaaa | aaaaa |
| Density | aaaaa | aaaaa |
| Depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 