A kind of waste cable conductor regeneration method
A technology for waste cables and conductors, which is applied in the recycling of circuits, electrical components, and electronic waste, etc. It can solve the defects of electrical conductivity of cable conductor materials, mechanical structure performance, anti-corrosion performance, poor product quality stability and reliability, and low efficiency of recycling operations. and other issues, to achieve the effect of increasing the recycling rate, reducing production and preparation costs, and low production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] like figure 1 Shown, a kind of waste and old cable conductor regeneration method comprises the following steps:
[0022] The first step is conductor prefabrication. Firstly, the insulation layer of the recycled waste cables is stripped, and then the stripped insulation layer, steel armor, tensile reinforcement and conductors are sorted and stored separately, and then the separated cable conductors are separated again according to the material type. Store them separately, and then pass Na 2 CO 3 Soak and wash in the solution for 3 minutes, then wash it with deionized water at a temperature of 10°C and a pressure of 3.1 times atmospheric pressure, and dry the cleaned conductor with cold air for later use;
[0023] The second step is the prefabrication of the smelting furnace. Firstly, the smelting furnace is connected with the inert gas source through the gas duct, and then the nitrogen gas is continuously fed into the smelting furnace, and the oxygen content in the sme...
Embodiment 2
[0030] like figure 1 Shown, a kind of waste and old cable conductor regeneration method comprises the following steps:
[0031] The first step is conductor prefabrication. Firstly, the insulation layer of the recycled waste cables is stripped, and then the stripped insulation layer, steel armor, tensile reinforcement and conductors are sorted and stored separately, and then the separated cable conductors are separated again according to the material type. Store them separately, and then pass Na 2 SiO 3 and Na 3 PO 4 Soak in the 1:1 mixed solution for 4 minutes, then wash it with deionized water at a temperature of 10°C and a pressure of 2 times the atmospheric pressure, and dry the cleaned conductor with cold air for later use;
[0032] The second step is the prefabrication of the smelting furnace. First, the smelting furnace is connected to the inert gas source through the gas duct, and then the argon gas is continuously introduced into the smelting furnace, and the oxyg...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 
