Water reducing agent for construction waste recycled concrete
A technology of concrete water reducing agent and construction waste, which is applied in the field of water reducing agent and construction waste recycling concrete water reducing agent, can solve the problems of unsuitable solid construction waste, high viscosity and difficult construction, and achieve good economic benefits and social benefits. Benefit, improved workability, well-adapted effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0012] A concrete water reducer for reuse of construction waste, the water reducer comprises the following components by mass: nitrate: 10-22 parts; β-naphthalenesulfonate formaldehyde condensate: 12-22 parts; lignin sulfonate salt: 2-5 parts; dodecylbenzenesulfonate: 0.5-2.5 parts; the nitrate is a mixture of barium nitrate and lead nitrate, wherein 1.5-3 parts of barium nitrate, 8-20 parts of lead nitrate, The water reducing agent is in powder form, and its particle diameter is less than 0.075mm.
[0013] The β-naphthalenesulfonate formaldehyde condensate is β-naphthalenesulfonate sodium formaldehyde condensate, the lignosulfonate is calcium lignosulfonate, and the dodecylbenzenesulfonate is dodecane Sodium benzenesulfonate, the chemical formula of the β-naphthalenesulfonate formaldehyde condensate is (C10H6CH2NaSO3) n, wherein n is 9-12.
[0014] The construction waste is concrete with steel bars removed.
[0015] The water reducer is prepared by the following method: acc...
Embodiment
[0016] Embodiment: A concrete water-reducer for reuse of construction waste, the water-reducer comprises the following components by mass: nitrate: 12 parts; β-naphthalenesulfonate formaldehyde condensate: 14 parts; lignosulfonic acid Salt: 3 parts; dodecylbenzene sulfonate: 1.5 parts; the nitrate is a mixture of barium nitrate and lead nitrate, wherein 2 parts of barium nitrate and 10 parts of lead nitrate are formulated according to the above formula and mixed Ball mill for 3-5 minutes to form a powder with a particle size of <0.075mm; take the construction waste and crush it into the required granular shape; add the above two into the mixer, add an appropriate amount of water, and stir for 8 minutes.
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 
