High impermeability cement-based repair material for tunnel engineering and preparation method thereof
A technology for tunnel engineering and repair materials, which is applied in the field of high impermeability cement-based repair materials and its preparation, can solve the problems of poor waterproof performance, unsatisfactory compressive and tensile strength, and low impermeability pressure of protective and repair linings, and achieve Solve the problem of tunnel water leakage, improve the operating environment of the tunnel, and have the effect of high anti-seepage pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] Example 1, a high-impermeability cement-based repair material for tunnel engineering, which consists of the following raw materials in parts by weight: 100 parts of ordinary Portland cement, 10 parts of fly ash, 5 parts of silica fume, and 30 parts of steel slag powder , 15 parts of rock powder, 20 parts of tailings sand, 300 parts of quartz sand, 5 parts of attapulgite, 45 parts of acrylate emulsion (solid content 45%), 1.0 part of cellulose ether, 0.45 part of polyacrylamide, 0.5 part of PVA fiber , 2.5 parts of PET fiber, 1.5 parts of polycarboxylate water reducer, 2.8 parts of defoamer, and 30 parts of water.
[0032] The preparation method of the above-mentioned high impermeability cement-based repair material for tunnel engineering comprises the following steps:
[0033] (1) Take the above proportioning raw materials, mix Portland cement, fly ash, silica fume, steel slag powder, rock powder, attapulgite, PVA fiber and PET fiber;
[0034] (2) Mix acrylic emulsion,...
Embodiment 2
[0036] Example 2, a high-impermeability cement-based repair material for tunnel engineering, consisting of the following raw materials in parts by weight: 100 parts of 52.5 grade ordinary Portland cement, 40 parts of fly ash, 20 parts of silica fume, steel slag powder 28 parts, 5 parts of rock powder, 50 parts of tailing sand, 130 parts of quartz sand, 10 parts of attapulgite, 70 parts of acrylate emulsion (solid content 60%), 0.1 part of cellulose ether, 1.0 part of polyacrylamide, PVA fiber 3.0 parts, 0.6 parts of PET fiber, 2.5 parts of polycarboxylate water reducer, 0.8 parts of defoamer, 50 parts of water. The preparation method of the above-mentioned high impermeability cement-based repair material for tunnel engineering is the same as that in Example 1.
Embodiment 3
[0037] Example 3, a high impermeability cement-based repair material for tunnel engineering, which consists of the following raw materials in parts by weight: 100 parts of 52.5 grade ordinary Portland cement, 20 parts of fly ash, 10 parts of silica fume, steel slag 5 parts of powder, 20 parts of rock powder, 45 parts of tailing sand, 50 parts of quartz sand, 2 parts of attapulgite, 10 parts of acrylate emulsion (solid content 60%), 0.8 part of cellulose ether, 0.6 part of polyacrylamide, PVA 1.0 parts of fiber, 0.8 parts of PET fiber, 1.0 parts of polycarboxylate water reducer, 1.2 parts of defoamer, and 25 parts of water. The preparation method of the above-mentioned high impermeability cement-based repair material for tunnel engineering is the same as that in Example 1.
PUM
Property | Measurement | Unit |
---|---|---|
specific surface area | aaaaa | aaaaa |
particle size | aaaaa | aaaaa |
particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com