BIM based assembly type machine room deepening design process and construction method thereof
A technology for deepening design and construction methods, applied in industrial construction, geometric CAD, etc., can solve problems such as large errors, low installation efficiency of pump station pipelines in the machine room, slowing down the progress of the project, etc., to achieve high work efficiency, improve cutting accuracy and welding quality. , the effect of improving the degree of safe construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0137] Project Name: Scientific Research Center Building of Xi'an Experimental and Testing Research Institute
[0138] Construction unit: Zhongtian Construction Group Co., Ltd.
[0139] Project Overview:
[0140] (1) Structure type: frame shear wall
[0141] (2) Construction area (m 2 ): 21700
[0142] (3) Project cost (10,000 yuan): 3900
[0143] (4) Start date: June 13, 2017; completion date: April 7, 2018
[0144] (5) Project location: Keyuan 3rd Road, Fengdong New City, Xixian New District, Shaanxi Province
[0145] (6) Construction method name: BIM-based construction method of prefabricated computer room
[0146] (7) Explanation of the application site and application effect of the construction method: The scientific research center building of Xi'an Experimental and Testing Research Institute is located at Keyuan 3rd Road, Fengdong New Town, Xixian New District, Shaanxi Province. It has a frame shear wall structure and a total construction area of 21,700 square met...
Embodiment 2
[0154] Project Name: Baihualin Reunion 1 Bid Project
[0155] Construction unit: Zhongtian Construction Group Co., Ltd.
[0156] Project Overview:
[0157] (1) Structure type: frame shear wall
[0158] (2) Construction area (m 2 ): 60,649m 2
[0159] (3) Project cost (10,000 yuan): 204.6 million yuan
[0160] (4) Start date: June 28, 2017; completion date: December 16, 2019
[0161] (5) Project location: North suburb of Xi'an, 200 meters north of the intersection of Fengcheng 8th Road and Minjing 1st Road
[0162] (6) Construction method name: BIM-based construction method of prefabricated computer room
[0163] (7) Explanation of the application site and application effect of the construction method: through the development and application of the construction method and the comparison of the economic benefits with the traditional method, the analysis of the economic benefits: the construction method of the prefabricated pump room (station) based on BIM is adopted in th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com