Blast hole construction method for reducing controlled blasting over-break and under-break through oblique flat curved tunnel

A construction method and inclined flat technology, which is applied in tunneling, blasting, earthwork drilling and mining, etc., can solve the problems of reducing the degree of over- and under-excavation of curved side walls, increasing the cost of construction measures, and low acceptance by the construction party, so as to reduce over-under-excavation Excavation volume, reduced construction cost, and wide application range

Active Publication Date: 2020-08-11
CHINA CONSTR RAILWAY INVESTMENT & CONSTR GRP CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the influence of the steel frame on the drilling of the arch is only considered, and the factors affecting the tunnel slope and flat curve are ignored, then under the same hole layout conditions that still consider the extrapolation angle, the degree of overbreak and underbreak of the tunnel arch and side walls will be extremely large. There may be a risk of further increase, and the actual amount of concrete spraying will further increase
At present, how to reasonably and effectively reduce the degree of over- and under-excavation of curved side walls is still somewhat rare.
[0004] (2) Vibration reduction control measures such as pipe shed and small pipe grouting in a certain area of ​​the arch will reduce the construction progress and increase the cost of construction measures to a certain extent; on the other hand, increasing construction investment will often be accepted by the construction party Low, more difficult to implement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Blast hole construction method for reducing controlled blasting over-break and under-break through oblique flat curved tunnel
  • Blast hole construction method for reducing controlled blasting over-break and under-break through oblique flat curved tunnel
  • Blast hole construction method for reducing controlled blasting over-break and under-break through oblique flat curved tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0072] The construction channel of a tunnel in a shallow subway section passes through an existing 220KV high-voltage iron tower. The design requires that the blasting vibration velocity V should not exceed 1cm / s, the design width B of the tunnel excavation is 6.52m, and the design vertical height H of the tunnel excavation 拱圈长眼 It is 6.48m. The grade of the surrounding rock is grade Ⅳ, and the integrity of the rock mass is good. The maximum slope along the tunnel slope is 12%, and the minimum slope is 11.83%. image 3 As shown, the curve radius R of the center line 19 of the tunnel line is 30m, and the footage length of a single cycle tunnel L 进尺 The vertical distance between the outer contour line 10 of the tunnel excavation side wall and the edge of the iron tower base is 18.15m, the height difference between the tunnel vault 2 and the bottom of the pile base is 39.8m, the blast hole utilization rate ξ is 90%, and the attenuation coefficient K is empirically The value is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a blast hole construction method for reducing controlled blasting over-break and under-break through an oblique flat curved tunnel. The method comprises the steps that a construction mode is designed, and a tunnel excavation contour line is optimized; cut holes, expanded holes, peripheral long holes and peripheral short holes are formed in a tunnel face, and the cut holes are formed in the both sides of a tunnel middle line at intervals symmetrically; the expanded holes are formed in the outer sides of the cut holes, and the cut holes and the expanded holes are arrangedsegmentally; the peripheral long holes and the peripheral short holes are uniformly arranged along the tunnel excavation contour line at intervals, and located on the inner side of the tunnel excavation contour line; and the peripheral short holes are arranged in the position, between the peripheral long holes and the cut holes, of the tunnel face. The method has the beneficial effects that the effects of tunnel inclination, flat curved tunnel side walls and other factors are considered in the blast hole construction method comprehensively, and a peripheral hole arrangement method is providedspecifically; and compared with an existing universal tunnel blasting hole arrangement method, the peripheral hole arrangement method has the advantage that the over-break and under-break degree is reduced.

Description

technical field [0001] The invention belongs to the field of tunnel engineering, and in particular relates to a construction method for reducing controlled blast over-under-excavation blastholes in inclined flat-curve tunnels. Background technique [0002] In recent years, with the continuous increase in the volume of tunnel construction in my country, the effective control of tunnel over-excavation and vibration velocity has become the focus of attention of all parties involved in the construction, especially during the construction of urban shallow-buried mine tunnels. There are many kinds of influencing factors on (structure) structures, and the tunnel overbreak and vibration velocity control have brought severe challenges. The existing tunnel overbreak control technology research results are mainly aimed at small slope tunnels or near-horizontal tunnels. The arch adopts long and short blastholes or dense holes and interval holes. Technical measures such as Φ108mm pipe sh...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): F42D1/00F42D3/04E21D9/00
CPCF42D1/00F42D3/04E21D9/006Y02E10/20
Inventor 邢振华潘广学代广伟田国锋朱国强侯健李英杰杨保华黄引赖永标
Owner CHINA CONSTR RAILWAY INVESTMENT & CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products