Treatment method for soft soil and liquefied soil interbed foundation
A treatment method and technology of liquefied soil, applied in soil protection, foundation structure engineering, sheet pile walls, etc., can solve the problems of pile foundation side resistance, high cost, and ground foundation without consideration of weak soil and liquefied soil layers Soil contribution and other issues can be improved to achieve the effect of improving soil liquefaction trend, low project cost and mature construction technology
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] refer to Figure 1-2 , a method for treating soft soil and liquefied soil interlayer foundation, the method comprises the following steps:
[0032] (1) Construction setting out and site leveling;
[0033] (2) The pile driver is in place: move the pile driver and align the drill bit with the pile position;
[0034] (3) Prepare cement slurry: use high-speed mixer to stir according to proportioning and prepare cement slurry;
[0035] (4) Pre-stirring sinking: start the mixer generator, and the drill pipe stirs the cut soil and sinks;
[0036] (5) Shotcrete mixing and lifting: Turn on the cement slurry pump, spray the slurry and rotate it to fully mix the cement slurry with the soil. The pile diameter and pile length are calculated and determined according to the bearing requirements of the upper structure. Soil layer 500mm;
[0037] (6) Repeated stirring, sinking and lifting: After reaching the design depth, lift the pile driver and carry out re-stirring until the orig...
Embodiment 2
[0046] (1) Project overview
[0047] A large-scale sewage treatment project is located in the southwestern part of a basin, which belongs to alluvial and lacustrine landforms. The current status of the site is cultivated land, the terrain is gentle and open, and the slope of the terrain is less than 5°. The west and south sides are the secondary tributaries of the Jinsha River. Due to the particularity of the location of the site, a unique stratum distribution pattern with a soft soil layer on the upper part and a liquefied soil layer on the lower part has been formed. Due to the severe limitation of the project cost and construction period, conventional foundation treatment methods cannot solve this engineering problem.
[0048] (2) Engineering geological conditions
[0049] The rock and soil layer of the site within the survey depth range can be divided into three major layers from top to bottom according to the genetic type, namely: ① layer of Quaternary cultivated soil (Q...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com