[0040] A method for controlling the roof of a coal mine fully mechanized mining face, comprising the following steps:
[0041] S1. Implement in-plane deep hole pre-splitting blasting to relieve pressure:
[0042] 1. Research on the height of the "three belts"
[0043] (1) Analysis of exploration holes along the airside
[0044] On the 1412A working face, Yunshun designed and implemented goaf exploration holes along the airside to obtain the "three zones" law of the goaf, as shown in figure 1 shown;
[0045] a. The contour line of fracture zone development
[0046] According to the moving and breaking law of overlying rock in the stope and the "three-zone theory" of rock pressure, it is believed that the fracture zone is developed at a height of 38m;
[0047] b. Linear Fitting Line
[0048] Linear fitting is performed on the average value of the data to obtain a linear fitting line, and the angle between it and the horizontal line is considered to be the roof collapse angl...
Embodiment 2
[0095] The difference between this embodiment and the above-mentioned embodiment is that this embodiment implements artificial false roof protection made of filling materials. In March 2019, the working surface started to erect the shed again, but the height of the roof falling near the 35# and 69# frames on the working surface is high , the distance between the sides is long, which seriously threatens the personal safety of construction workers, so 301 filling material is used for the first time;
[0096] It has been used successively during the scaffolding period and when a large number of people are required to enter the side of the coal wall, such as manual unloading. First, it fills the cracks between part of the gangue, so that the broken gangue forms a whole, reducing the workload of the top connection. Security threats during scaffolding.
Embodiment 3
[0098] The difference between this embodiment and the above-mentioned embodiments is that this embodiment forms a management concept of detailed control and rapid advancement, adheres to the new concept of "quality first, quality guarantees progress", puts quality management at the core position, and takes mining height control as a The top priority of daily management; the foundation of rapid advancement lies in all-round equipment reliability guarantee and overall optimization of labor organization.
[0099] 1. Detailed control
[0100](1) Specification quality control
[0101] "Three straight, two flat, one clean and two smooth" means that the support is straight, the chain conveyor is straight, the coal wall is straight, the top and bottom plates are flat, the floating coal sundries are clean, and the upper and lower outlets are unblocked. The eight requirements are to be adhered to and strictly implemented by the fully mechanized mining team in daily management, especial...