Pavement structure and pavement method of combined steel bridge deck
A combined and steel bridge technology, applied in bridges, bridge parts, bridge construction, etc., can solve problems such as the impact of drainage function, the impact of the durability of the lower structural layer, and the early damage of the pavement layer, so as to achieve uniform force and reduce Risk of drainage functional layer, effect of distributed load stress concentration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0036] Below in conjunction with embodiment the present invention is described in further detail:
[0037] A pavement method for a composite steel bridge deck comprises the following steps:
[0038] 1. Close the traffic, use hammer and chemical reagents to remove obvious sundries, welding bumps, burrs, grease, etc. on the surface of the steel plate, and conduct preliminary treatment on the steel plate interface.
[0039] 2. Use the automatic dust-free shot blasting machine and sandblasting machine to derust the steel plate, so that the steel plate forms a fresh and clean interface with a certain roughness.
[0040] 3. Coat a layer of reactive resin glue on the treated steel plate interface, the coating amount is 0.9~1.1kg / m 2 ; and simultaneously spread a layer of 3-5mm single-size crushed stones, with an amount of 5-7kg / m 2 , solidify together to form a roughened layer with sufficient bite strength.
[0041] The reactive resin compound here is made of epoxy resin as compon...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Particle diameter | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More