Method and device for stabilizing chemical sludge
A technology for chemical sludge and sludge, applied in sludge treatment, sludge treatment, biological sludge treatment, etc., can solve the problem of inability to achieve sludge stabilization, shorten the sludge stabilization period, and facilitate industrial implementation. , Improve the effect of ultrasonic intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] The residual sludge of a chemical sewage treatment plant has a sludge concentration of 31.5g / L after being concentrated. The sludge is pretreated by alkaline hydrolysis with sodium hydroxide + ultrasonic, and sodium hydroxide is added to adjust the pH of the sludge mixture to 12.5 The alkaline hydrolysis stirring time is 24h, the ultrasonic frequency is 19.0kHz, the energy density is 50w / L, the ultrasonic reaction time is 300S, and the sludge breaking rate is 18%. The sludge after cracking is treated by anoxic / aerobic digestion process, the stirring time of anoxic reaction is 24h, the aeration time of aerobic reaction compressed air is 24h, and the dissolved oxygen concentration is 7.5-10mg / L. The sludge organic matter removal rate is 50%, and the sludge stabilization time is 15 days.
Embodiment 2
[0036] The residual sludge of a chemical wastewater treatment plant has a sludge concentration of 41.7g / L after being concentrated. The sludge is pretreated by alkaline hydrolysis with potassium hydroxide + ultrasonic, and potassium hydroxide is added to adjust the pH of the sludge mixture to 11.0 The alkaline hydrolysis stirring time is 11h, the ultrasonic frequency is 25.0kHz, the energy density is 30w / L, the ultrasonic reaction time is 120S, and the sludge breaking rate is 16%. The sludge after cracking is treated by anoxic / aerobic digestion process, the anoxic reaction stirring time is 12h, the aerobic reaction compressed air aeration time is 12h, and the dissolved oxygen concentration is 5-7mg / L. The removal rate of sludge organic matter was 47.8%, and the sludge stabilization time was 18 days.
Embodiment 3
[0038] The residual sludge of a chemical sewage treatment plant has a sludge concentration of 23.8g / L after being concentrated. The sludge is pretreated by alkaline hydrolysis with sodium bicarbonate + ultrasonic, and sodium bicarbonate is added to adjust the pH of the sludge mixture to 9.5 The alkaline hydrolysis stirring time is 6h, the ultrasonic frequency is 30.0kHz, the energy density is 5w / L, the ultrasonic reaction time is 30S, and the sludge breaking rate is 12.0%. The sludge after cracking is treated by anoxic / aerobic digestion process, the anoxic reaction stirring time is 8h, the aerobic reaction compressed air aeration time is 8h, and the dissolved oxygen concentration is 3-5mg / L. The sludge organic matter removal rate was 44.1%, and the sludge stabilization time was 19 days.