A temperature-resistant and vibration-reducing sealing gasket and an automobile air conditioner with the sealing gasket
A sealing gasket and temperature-resistant technology, applied in the field of automobile air conditioning, can solve the problems of reducing automobile quality, easy to break, increasing automobile maintenance costs, etc., and achieve the effects of good gasket resilience, saving maintenance costs, and less maintenance times
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Embodiment 1: the preparation technology of this gasket, comprises the following steps:
[0037] 1) Spray and clean the surface of EPDM rubber closed-cell foam sheet, and dry it at 70°C;
[0038] 2) Corona polarization on the surface of EPDM rubber closed-cell foam sheet;
[0039] 3) Airlessly spray a layer of expanded perlite micro-powder heat-resistant heat-resistant paint with a thickness of 0.2mm on the upper and lower surfaces of the EPDM rubber closed-cell foam sheet, and dry at 75°C for 30 minutes to dry the heat-insulated paint ;
[0040] 4) If it is necessary to thicken the coating, repeat step 3) several times after the coating is dried until the required thickness is reached;
[0041] 5) Coat the back glue on the thermal insulation paint, and cover the back glue with silicone oil paper;
[0042] 6) Die-cutting, that is, the preparation of the seal is completed.
Embodiment 2
[0043] Embodiment 2: the preparation technology of this gasket, comprises the following steps:
[0044] 1) Spray and clean the surface of the EPDM rubber closed-cell foam sheet, and dry it at 75°C;
[0045] 2) Corona polarization on the surface of EPDM rubber closed-cell foam sheet;
[0046] 3) Airlessly spray a layer of expanded perlite micro-powder heat-resistant heat-resistant paint with a thickness of less than 0.35mm on the upper and lower surfaces of the EPDM rubber closed-cell foam sheet, and dry it at 80°C for 35 minutes to dry the heat-insulated paint. Dry;
[0047] 4) If it is necessary to thicken the coating, repeat step 3) several times after the coating is dried until the required thickness is reached;
[0048] 5) Coat the back glue on the thermal insulation paint, and cover the back glue with silicone oil paper;
[0049] 6) Die-cutting, that is, the preparation of the seal is completed.
Embodiment 3
[0050] Embodiment 3: the preparation technology of this gasket, comprises the following steps:
[0051] 1) Spray and clean the surface of EPDM rubber closed-cell foam sheet, and dry it at 80°C;
[0052] 2) Corona polarization on the surface of EPDM rubber closed-cell foam sheet;
[0053]3) Airlessly spray a layer of expanded perlite micro-powder heat-resistant heat-resistant paint with a thickness of 0.4mm on the upper and lower surfaces of the EPDM rubber closed-cell foam sheet, and dry it at 83°C for 38 minutes to dry the heat-insulated paint ;
[0054] 4) If it is necessary to thicken the coating, repeat step 3) several times after the coating is dried until the required thickness is reached;
[0055] 5) Coat the back glue on the thermal insulation paint, and cover the back glue with silicone oil paper;
[0056] 6) Die-cutting, that is, the preparation of the seal is completed.
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

