Low-cost chromium-molybdenum steel smelting production method
A production method and technology for chromium molybdenum steel, applied in the field of metallurgy, can solve the problems of high cost and high energy consumption, and achieve the effects of low cost, low energy consumption and large pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] The chromium-molybdenum steel plate 14Cr1MoR product thickness of present embodiment low-cost smelting is 8mm, and its production method comprises the following processing steps:
[0024] (1) The molybdenum oxide balls with a molybdenum content of 60% and scrap steel are directly mixed into the converter, and then the iron mixing operation is performed, and the steel output is 111 tons;
[0025] (2) After the converter smelting is completed, the molten steel is transferred to the ladle furnace for refining and VD vacuum treatment in sequence. The vacuum degree of VD vacuum treatment is 66Pa, and the vacuum treatment time is 25min. billet;
[0026] (3) The continuous casting billets were stacked for 24 hours and then unstacked. Rolling was completed in a 4100mm rolling mill, and 14Cr1MoR finished steel plates were obtained after flaw detection and heat treatment.
[0027] The flaw detection of the steel plate meets the NB / T47013.3-2015 standard Class I qualification, an...
Embodiment 2
[0030] The chromium-molybdenum steel plate 14Cr1MoR product thickness of present embodiment low-cost smelting is 110mm, and its production method comprises the following processing steps:
[0031] (1) Mix molybdenum oxide balls with a molybdenum content of 62% and scrap steel directly into the converter, and then perform iron mixing operation, with a steel output of 115 tons;
[0032] (2) After the converter smelting is completed, the molten steel is transferred to the ladle furnace for refining and VD vacuum treatment in sequence. The vacuum degree of VD vacuum treatment is 66Pa, and the vacuum treatment time is 26min. billet;
[0033] (3) Continuous casting blanks were stacked for 28 hours and then unstacked, rolled in a 4100mm rolling mill, and 14Cr1MoR finished steel plates were obtained after flaw detection and heat treatment.
[0034] The flaw detection of the steel plate meets the NB / T47013.3-2015 standard Class I qualification, and the pass rate of flaw detection is 1...
Embodiment 3
[0037] The chromium-molybdenum steel plate 15CrMoR product thickness of present embodiment low-cost smelting is 8mm, and its production method comprises the following processing steps:
[0038] (1) The molybdenum oxide balls with a molybdenum content of 63% and scrap steel are directly mixed into the converter, and then the iron mixing operation is performed, and the steel output is 118 tons;
[0039] (2) After the converter smelting is completed, the molten steel is transferred to the ladle furnace for refining and VD vacuum treatment in sequence. The vacuum degree of VD vacuum treatment is 66Pa, and the vacuum treatment time is 27min. billet;
[0040] (3) The continuous casting billets were stacked for 24 hours, then unstacked, rolled in a 4100mm rolling mill, and 15CrMoR finished steel plates were obtained after flaw detection and heat treatment.
[0041] The flaw detection of the steel plate meets the NB / T47013.3-2015 standard Class I qualification, and the pass rate of f...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| yield strength | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |