Water-based damping adhesive
A damping glue, water-based technology, applied in the direction of natural rubber coatings, coatings, conjugated diene coatings, etc., can solve the problems of performance degradation, poor sound insulation effect, long time consumption, etc., to achieve environmental sanitation improvement, smooth and beautiful surface, The effect of fast film formation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] At 25°C, add 1 kg of monoglyceride stearate and 5 kg of diethanolamide to 6 kg of natural rubber, stir for 30 minutes, then add 2 kg of paraffin oil, 1 kg of polyisobutylene and 5 kg of bentonite, and stir for another 30 minutes to obtain synthetic rubber. Continue to add 74kg of asphalt to the synthetic rubber, stir for 30 minutes, then add 1kg of hydrotalcite FM300 calcium zinc stabilizer and 5kg of silicone oil defoamer, and then fully stir for 30 minutes to obtain the final product.
Embodiment 2
[0020] At 25°C, add 1kg glyceryl tristearate and 5kg fatty alcohol polyoxyethylene ether to 10kg natural rubber, stir thoroughly for 30min, then add 3kg paraffin oil, 2kg polyisobutylene and 10kg light calcium carbonate, and stir thoroughly for another 30min , to obtain synthetic glue. Continue to add 60kg of asphalt to the synthetic rubber, stir for 30 minutes, then add 4kg of hydrotalcite FM300 compounded calcium zinc stabilizer and 5kg of silicone oil defoamer, and then fully stir for 30 minutes to obtain the final product.
Embodiment 3
[0022] At 25°C, add 1kg of vinyl bisstearamide and 5kg of softening sodium dodecylbenzenesulfonate to 6kg of natural rubber, stir thoroughly for 30 minutes, then add 5kg of paraffin oil, 5kg of polyisobutylene and 12kg of talcum powder, and then fully stir After 30 minutes, synthetic glue was obtained. Continue to add 59kg of asphalt to the synthetic rubber, stir for 30 minutes, add 2kg of hydrotalcite FM300 compounded calcium zinc stabilizer and 5kg of silicone oil defoamer, and then fully stir for 30 minutes to obtain the final product.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More