High-modulus asphalt and preparation method thereof
A high-modulus, asphalt technology, applied in building components, building insulation materials, buildings, etc., can solve the problems of unfavorable low-temperature performance of asphalt, limited reserves of natural asphalt, unfavorable environmental protection, etc. , the effect of convenient industrial application
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] No. 40 low-grade asphalt (penetration 37dmm, softening point 53.5 ℃), from two kinds of crude oil in the Middle East cut by real boiling point, the raw material is 500 parts; polymer modifier 791SBS is 22.5 parts; Boyue stabilizer is 1 part; Guangzhou Hongmian Deodorant is 0.015 parts.
[0043] Preparation method: Add SBS modifier to base asphalt, raise the temperature to 180°C, use a shearing machine to shear at a shear rate of 4500r / min for 0.5h, transfer to a constant temperature heating mantle, and add stabilizer , constant temperature at 177°C, stirring at a speed of 800r / min for 1.0h, then transferred to an oven at the same temperature for static development / defoaming for 20min, and then sample preparation.
Embodiment 2
[0045] No. 40 low-grade asphalt (penetration 40dmm, softening point 52.5°C), which is obtained from two crude oils from the Middle East and Canada by cutting the real boiling point. The raw material is 500 parts; polymer modified asphalt 791SBS is 23 parts; Zhongquan protection is stable The agent is 1.1 parts; the Tianjin Haitai deodorant is 0.005 parts.
[0046]Preparation method: Add SBS modifier to base asphalt, raise the temperature to 180°C, use a shearing machine to shear at a shear rate of 4500r / min for 0.5h, transfer to a constant temperature heating mantle, and add stabilizer , constant temperature at 177°C, stirring at a speed of 800r / min for 1.0h, then transferred to an oven at the same temperature for static development / defoaming for 20min, and then sample preparation.
Embodiment 3
[0048] No. 40 low-grade asphalt (penetration 43dmm, softening point 51.5°C) is obtained from a certain crude oil in the Middle East by cutting it at the real boiling point. The raw material is 500 parts; polymer modified bitumen 791SBS is 24.5 parts; Boyue stabilizer is 1.2 parts ; Zhonghai Shunda deodorant is 0.01 part. Preparation method: Add SBS modifier to base asphalt, raise the temperature to 180°C, use a shearing machine to shear at a shear rate of 4500r / min for 0.5h, transfer to a constant temperature heating mantle, and add stabilizer , constant temperature at 177°C, stirring at a speed of 800r / min for 1.0h, then transferred to an oven at the same temperature for static development / defoaming for 20min, and then sample preparation.
PUM
| Property | Measurement | Unit |
|---|---|---|
| softening point | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
| penetration | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

