Durable ultrathin wearing layer and preparation method thereof
A wear layer, ultra-thin technology, applied in adhesive types, building components, asphalt material adhesives, etc., can solve the problem of limited interlayer adhesion and durability modification, affecting road surface skid resistance and driving comfort , affecting comprehensive road performance and other issues, to achieve the effect of improving road performance, reducing mixing difficulty and construction difficulty, and improving anti-aging effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] A durable ultra-thin wear layer, comprising a bonding layer and an ultra-thin surface layer, the preparation method of which comprises the following steps:
[0057] 1) Carry out cleaning and disease pretreatment on the original pavement where a thin wearing layer needs to be laid;
[0058] 2) Sprinkle 0.8L / m on the original road surface at room temperature, meet the construction conditions, and in non-rainy conditions 2 The composite modified emulsified asphalt, spray 0.7L / m after demulsification (25min) 2 Calcium hydroxide solution (mass concentration of calcium ion is 0.15%), forms bonding layer;
[0059] 3) Prepare ultra-thin surface layer asphalt mixture, each component and its dosage include: composite modified asphalt 7%, coarse aggregate (basalt) 66.5%, fine aggregate (diabase rock chips) 23.5%, filler 3% (1% montmorillonite, 2% diatomite); mix the weighed raw materials at 170°C to obtain the ultra-thin surface layer asphalt mixture;
[0060] 4) spreading the ...
Embodiment 2
[0062] A durable ultra-thin wear layer, comprising a bonding layer and an ultra-thin surface layer, the preparation method of which comprises the following steps:
[0063] 1) Carry out cleaning and disease pretreatment on the original pavement where a thin wearing layer needs to be laid;
[0064] 2) Sprinkle 0.6L / m on the original road surface at room temperature, meet the construction conditions, and in non-rainy conditions 2 The composite modified emulsified asphalt, spray 0.5L / m after 20min after demulsification 2 A barium hydroxide solution (the mass concentration of barium ions is 0.15%) to form a bonding layer;
[0065] 3) Prepare ultra-thin surface layer asphalt mixture, each component and its dosage include: composite modified asphalt 7%, coarse aggregate (basalt) 66.5%, fine aggregate (diabase rock chips) 23.5%, filler 3% (1% montmorillonite, 2% diatomite); mix the weighed raw materials at 170°C to obtain the ultra-thin surface layer asphalt mixture;
[0066] 4) sp...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
| voidage | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 