Top plate supporting structure

The utility model relates to the technical field of top plate supporting, and discloses a top plate supporting structure. The top plate supporting structure comprises a top plate structure, an anchor rod is movably installed below the top plate structure in a penetrating mode, a glue injection opening is fixedly formed in the center of the anchor rod in a penetrating mode, a top beam is movably installed on one side of the anchor rod, a supporting rod is fixedly connected to the lower portion of the top beam, and a connecting rod is movably installed below the supporting rod; a supporting sleeve is fixedly installed on the outer surface of the connecting rod, and the two sides of the supporting sleeve are fixedly connected with bases. The anchor rod penetrates through the top plate structure, one end of the anchor rod penetrates through the top of the coal well, the top plate structure is used for supporting the top of the coal well, the anchor rod is installed and used in a matched mode according to the size of the top of the coal well, and meanwhile the anchor rod structure penetrates through the glue injection opening which is used for injecting resin cartridges into coal well rocks. The installation and use stability of the top plate supporting structure is conveniently improved, and the risk of top plate collapse and fracture is effectively reduced.
Owner:SHANXI LIULIN ZHAIYADI COAL CO LTD

Special water-retaining agent for wet-process sand making concrete

The invention relates to a special water-retaining agent for wet-process sand making concrete, which is prepared from the following raw materials in parts by weight: 2.0-5.0 parts of nano modified tailing powder; 1.0 to 5.5 parts of sodium alginate; 20 to 45 parts of polypropylene glycol; 0.5 to 1.0 part of a wetting agent; 5.0 to 10.0 parts of a viscosity modifier; and 30 to 55 parts of deionized water. The invention not only solves the problem that the existing water-retaining agent has great influence on the fluidity of concrete, but also solves the problem of abnormal fluctuation of the workability of the concrete due to the change of the water content of the raw materials, the content of stone powder and the like; the concrete water-retaining agent has the advantages of improving the water-retaining property of concrete, reducing the slump and expansion loss of the concrete and keeping the stability of a concrete system for a long time.
Owner:ZHEJIANG COMMUNICATIONS CONSTRUCTION NEW MATERIAL CO LTD

Width widening structure for filling engineering

ActiveCN222499877UImprove slope stabilityReduce slumpArtificial islandsRoadwaysGeogridRetaining wall
The utility model relates to a widening structure for filling engineering, which relates to the field of geotechnical engineering technology, and comprises a retaining wall structure, a filling body arranged in the retaining wall structure, a first reinforcing assembly used for connecting the filling body and an existing roadbed slope, and a second reinforcing assembly used for connecting the retaining wall structure and the filling body; the retaining wall structure comprises a side slope retaining wall abutting against a newly-built roadbed side slope, a horizontal baffle abutting against the top of the newly-built roadbed, a one-way geogrid arranged at the bottom of the newly-built roadbed, a foot wall arranged at the end, away from the horizontal baffle, of the side slope retaining wall and a drainage ditch adjacent to the foot wall, and the horizontal baffle is connected with the side slope retaining wall. The end, away from the slope retaining wall, of the horizontal baffle is erected on the horizontal plane of the existing roadbed, the first reinforcing assembly comprises a reinforcing rod, one end of the reinforcing rod is arranged in the filling body, and the other end of the reinforcing rod is arranged in the existing roadbed. The connecting structure has the effect of improving the connecting stability of the newly-built roadbed and the existing roadbed so as to improve the safety and stability of the newly-built roadbed.
Owner:TIANJIN LUAN ELECTRIFICATION SUPERVISION

Electroplated metal laser full wrap film with surface texture

This application relates to the field of full transfer film technology, specifically disclosing an electroplated metal laser full transfer film with surface texture. The electroplated metal laser full transfer film with surface texture includes a substrate, a release layer, a laser molding layer, an aluminum plating layer, and an adhesive layer. The laser molding layer coating is prepared from acrylic resin, alkyd resin, isocyanate curing agent, hexamethylolmelamine, hydroxyl acrylate, modified filler, leveling agent, defoamer, pigment, and solvent. The modified filler is prepared from nano-alumina, polyethyleneimine, and fumaric acid, with a mass ratio of nano-alumina, polyethyleneimine, and fumaric acid of 1:(0.4-0.6):(0.7-1). This invention effectively improves the surface adhesion of the laser molding layer, reduces the separation of the laser molding layer during hot stamping, and improves the quality of the full transfer film.
Owner:FOSHAN AOBAI PACKAGING MATERIAL CO LTD

Foam fracturing and fire blast synergistic advanced presplitting roof caving method for coal mine

The invention discloses a coal mine foam fracturing and fire blast synergistic advanced presplitting roof caving method. The method comprises the following steps that S1, drilling is constructed; constructing a drill hole in a proper position of the top rock stratum of the coal seam; s2, preparing a foam fracturing fluid; the preparation and foaming of the foam fracturing fluid are realized through the foam preparation device, and combustible gas is injected during foaming; s3, fracturing is carried out; a fracturing system is arranged at the drill hole, foamed foam fracturing fluid is injected into the drill hole through the fracturing system, and a crack is formed; s4, blasting and caving; and when the hole fracture of the roof rock stratum meets the fire blast requirement, injection of the foam fracturing fluid is stopped, and then ignition and detonation are conducted. Foam fracturing is combined with burning and explosion, the foam fracturing enables a roof rock stratum to generate a large number of hole cracks, the strength of the roof rock stratum is weakened, a burning and explosion space is provided for the burning and explosion technology, the safety of caving of a mining working face is guaranteed, advanced caving can be achieved, and the safety problem caused by the fact that a hard roof is difficult to fall in a goaf is solved.
Owner:SHANDONG UNIV OF SCI & TECH

Battery cell and battery pack

ActiveCN224625704UImprove stability and securityReduces the risk of collapse and crushing of the electrode assembly
This utility model relates to the field of new energy battery technology, and discloses a battery cell and a battery pack. The battery cell has a first direction and a second direction that are perpendicular to each other, and includes: a top cover plate with a positioning groove; an insulating component including a main body and a first protrusion, the first protrusion being located on the side of the main body away from the top cover plate, the first protrusion including a platform body with a clearance groove, the platform body being connected to the main body, the clearance groove penetrating a portion of the platform body along the second direction; and a first positioning post, one end of which passes through the positioning groove and is connected to the top cover plate, and the other end of which is connected to the main body. Along the first direction, the orthographic projection of the first positioning post on the first protrusion is at least partially located in the clearance groove, and the orthographic projection of the first positioning post on the main body is offset from the orthographic projection of the platform body on the main body. The first protrusion is a common location for the insulation component to collapse. Increasing the force exerted by the first positioning post on the insulation component at the first protrusion can reduce the collapse amplitude of the first protrusion and improve the safety and stability of the battery cell.
Owner:SUNWODA MOBILITY ENERGY TECHNOLOGY CO LTD

River channel slope protection reinforcing device for hydraulic engineering design

The invention discloses a riverway slope protection reinforcing device for hydraulic engineering design, and relates to the technical field of hydraulic engineering, the riverway slope protection reinforcing device comprises a placement platform, a plurality of inner device boxes are arranged above the placement platform, the upper surface of each inner device box is provided with a top encryption net and a protection mechanism, and the protection mechanism comprises an outer box assembly and a reset assembly. The outer box assembly comprises upper-layer stabilizing boxes and lower-layer stabilizing boxes, the upper-layer stabilizing boxes and the lower-layer stabilizing boxes are fixedly installed on the upper surface of the placement platform, each upper-layer stabilizing box and each lower-layer stabilizing box are each internally provided with an inner device box, the reset assembly comprises two buoyancy bags, and the two buoyancy bags are located on the surfaces of the two sides of each inner device box correspondingly; according to the scheme, by arranging the protection mechanism and the anti-collapse mechanism, the overall stability and impact resistance of the riverway slope protection reinforcing device are improved, and the risks of stone collapse and gabion collapse are effectively reduced.
Owner:山东黄河勘测设计研究院有限公司

Large drawing machine winding frame capable of arranging wires for cable production

The utility model discloses a large drawing machine winding frame capable of arranging wires for cable production, and belongs to the technical field of wire and cable production equipment. Comprising a bottom plate, a circle of outer vertical rods and a circle of inner vertical rods are evenly distributed and fixed on the circumference of the bottom plate, the circle where the outer vertical rods are located and the circle where the inner vertical rods are located are concentric circles, outer rings are arranged on the tops of the outer vertical rods, a top plate is arranged on the tops of the inner vertical rods, and a plurality of wire arranging wheels are evenly distributed on the upper portions of the inner vertical rods. According to the utility model, the length of the wire arranging rod I and the length of the wire arranging rod II of the wire arranging wheel are different, coils are guided to fall into different areas in the wire containing cylinder, the normal distribution phenomenon caused by free falling of conductors is eliminated, the collapse and winding of the coils are reduced, and the smoothness of paying off is improved; the coils are evenly and tightly arranged in the wire containing barrel, and the loading capacity is increased.
Owner:BAIYIN NONFERROUS CHANGTONG WIRE & CABLE CO LTD +1

Roller welding head and roller welding device

The utility model provides a roll welding head and a roll welding device. The roll welding head comprises a welding handle, a first rolling wheel, a connecting part and a second rolling wheel which are sequentially connected in the axial direction of the roll welding head, and welding working faces are formed on the outer circumferences of the first rolling wheel and the second rolling wheel. According to the roll welding device, the roll welding head is provided with the two welding working faces, in the conveying process of the to-be-welded workpiece, the welding working face on the first rolling wheel is welded to form an aligned welding seam, the welding working face on the second rolling wheel is welded to form an overflowing welding seam, and the action processes of feeding, unwinding, roll welding, dust removal and winding do not need to be repeated twice; and the welding processing efficiency can be improved. And moreover, the states that the pole piece and the foil are welded to form an overflowing welding seam and the welding seam is not aligned do not exist, so that the phenomena of collapse and wrinkling of the pole lug can be reduced, and the process yield is improved.
Owner:CHONGQING FUDI BATTERY RES INST CO LTD

Earth rock cofferdam structure for diversion building

The utility model discloses an earth rock cofferdam structure for a diversion building, and relates to the technical field of cofferdam construction, the earth rock cofferdam structure comprises two cofferdam main bodies arranged on the upstream and downstream of a river channel, the cofferdam main bodies are transversely arranged in the river channel and fixedly connected with river banks on the two sides of the river channel, and diversion canals are formed in the river banks at the same ends of the two cofferdam main bodies; the diversion canal is communicated with the upstream and downstream of the river channel, and a diversion foundation wall is arranged on the side, close to the cofferdam bodies, of the diversion canal and fixedly connected with the ends, close to the diversion canal, of the two cofferdam bodies. The diversion canal is excavated on the river bank located at the same end of the two cofferdam bodies, the diversion canal guides water flow on the upstream of the river channel to the downstream of the river channel, the diversion canal is formed in the river bank to replace a tunnel, and it is avoided as much as possible that the tunnel is scoured for a long time, collapses and influences a construction site in the cofferdam.
Owner:NINGBO HUAKANG LUDING CONSTR CO LTD

Insole rear heel support structure and forming mold thereof

ActiveCN224408549Uimprove bindingReduce flat feetClosed cavityPhysics
The application relates to the technical field of shoe accessory, in particular to a shoe-pad rear-heel supporting structure and a forming die thereof, which comprises a bottom die, a middle die and a top die, the bottom die is rotationally connected with the middle die, the top die is rotationally connected with the bottom die, the middle die is located between the bottom die and the top die, a placing seat for placing a supporting plate is arranged on the bottom die, a through seat hole for the placing seat to pass through is arranged on one side of the middle die close to the bottom die, a palm-pad protrusion is arranged on one side of the top die close to the middle die, a bottom groove is arranged on the middle die, the through seat hole and the bottom groove are in communication, a surrounding ring is arranged on the middle die, the palm-pad protrusion, the bottom groove, the placing seat and the surrounding ring are enclosed to form a closed cavity for forming a rear palm pad in the state that the bottom die, the middle die and the top die are mutually overlapped, and a locking assembly is arranged on the bottom die. The application has the effect of improving the combination tightness between shoe-pad components.
Owner:FOSHAN BAOMIN SHOES CO LTD

Progressive die stamping device and method for metastable stainless steel multi-bending component

PendingCN121972563AEffectively control martensitic transformation strainAvoid brittle transitionsShaping toolsStampingSS - Stainless steel
The invention belongs to the technical field of stamping, and particularly relates to a progressive die stamping device and method for a metastable stainless steel multi-bending component. The device comprises a base, and a blanking unit and a multi-stage stamping die unit which are sequentially arranged on the base, the punching unit comprises a pressing die assembly, a punching die assembly, a pressing die locking mechanism and a punching die locking mechanism. A guide column is arranged on the base, the pressing die assembly and the punching die assembly are in sliding fit with the guide column, the pressing die assembly is used for pressing a progressive die punching metal plate, and the punching die assembly is used for punching the progressive die punching metal plate; the pressing die locking mechanism and the punching die locking mechanism are arranged on the two sides of the base correspondingly, the pressing die locking mechanism is used for locking the pressing die assembly, and the punching die locking mechanism is used for locking the punching die assembly; the multi-stage punching die unit is used for conducting multi-stage punching and blanking on the punched part of the progressive die punching metal plate in sequence. According to the method, high-efficiency, low-cost and batch stamping forming of the low-temperature high-toughness thin-wall multi-bending component is achieved, and the formed part does not need follow-up heat treatment annealing.
Owner:HARBIN INST OF TECH AT WEIHAI +1