Special modified asphalt waterproof sheet material based on BIPV technique and manufacturing method thereof
A technology of modified asphalt and waterproof membrane, which is applied in the field of solar energy utilization and waterproof materials, which can solve the problems of waterproof membrane and battery components falling off and low softening point, so as to increase the stability of humidity and heat, increase the softening point, and reduce the expansion of temperature difference effect of magnitude
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0052] A preparation method based on BIPV technology-specific modified asphalt waterproofing membrane, comprising the following steps:
[0053] 1) Add petroleum asphalt into the reactor, heat and stir at 180~190°C for dehydration;
[0054] 2) According to the ratio described in claim 1, add residual oil, SBS rubber, and silicone rubber in sequence, and keep stirring for 2 hours;
[0055] 3) Pour the processed material in step 2) into the colloid mill for grinding, and grind it in a cycle for three times, and continue to stir and disperse for 30-60 minutes after grinding;
[0056] 4) Cool down to about 160°C, add coumarone resin, and keep stirring for 1 hour;
[0057] 5) Add UV absorber, antioxidant, talcum powder, stir and mix evenly, pour into oil immersion tank;
[0058] 6) Unfold the base layer of the glass fiber reinforced polyester felt, put it into the oil immersion tank, and carry out oil immersion coating;
[0059] 7) Control the thickness of the oil-immersed coatin...
Embodiment 1
[0067] Add 30g of petroleum asphalt into the reactor, heat and stir at 180~190°C for dehydration, add 20g of residual oil, 5g of star-shaped SBS rubber, and 2g of silicone rubber in sequence, keep stirring for 2 hours, then pour it into a colloid mill and grind it for three times. After grinding, continue to stir for 30-60 minutes, lower the temperature to 160°C, add 5 coumarone resin, keep stirring for 1 hour, then add 0.1g of antioxidant di-tert-butyl p-cresol, 5g of anti-ultraviolet absorber Mg-Al-based LDHs compound , 20g talcum powder, stir evenly, pour the SBS modified asphalt oil immersion material into the oil immersion tank, unfold the tire base material, put it into the oil immersion tank, apply oil immersion, cool, and cover.
[0068] The upper surface of the waterproof material layer is coated with shale isolation film, the material thickness of the waterproof layer is 1mm, the lower surface of the waterproof reinforcement layer is coated with hot-melt PE film, the ...
Embodiment 2
[0070] Add 60g of petroleum asphalt into the reactor, heat and stir at 180~190°C for dehydration, add 10g of residual oil, 15g of star-shaped SBS rubber, and 10g of silicone rubber in sequence, heat and stir for 2 hours, then pour it into a colloid mill and grind it for three times. After grinding, continue stirring for 30-60 minutes, lower the temperature to 160°C, add 10g of coumarone resin, keep stirring for 1h, add 1g of antioxidant di-tert-butyl p-cresol, 2g of anti-ultraviolet absorber Zn-Al-based LDHs compound, 10g Talc powder, stir evenly, pour the SBS modified asphalt oil immersion material into the oil immersion tank, unfold the tire base material, put it into the oil immersion tank, oil immersion coating, cooling, and film coating.
[0071] The upper surface of the waterproof material layer is coated with shale isolation film, the thickness of the waterproof layer is 2mm, the lower surface of the waterproof reinforcement layer is a hot-melt PE film, the thickness of ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 