Quick cold-patch repair method for asphalt pavement, and application thereof
An asphalt pavement and repair method technology, applied in the field of road repair materials, can solve the problems of difficulty in meeting high-grade pavements to be opened to traffic as soon as possible, low initial strength of cold patched asphalt mixture, and long time required for strength growth, achieving strong adjustability. , The effect of saving equipment investment and saving materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] The magnesium phosphate cement used is prepared from magnesium oxide, diammonium hydrogen phosphate, and borax according to the ratio of 1:0.2:0.05. The relationship between the molar amounts of diammonium hydrogen phosphate, borax and magnesia should be represented by the molar ratio of borax to magnesia, potassium dihydrogen phosphate and magnesia, namely B / M and P / M.
[0028] 30 parts of newly prepared magnesium phosphate cement; in addition, 10 parts of fine sand, 5 parts of medium sand, 10 parts of crushed stone with a particle size of 5-20 mm, 4 parts of water-soluble polyurethane, 3 parts of rubber powder, and 0 parts of air-entraining agent.
[0029] The technical indicators of the asphalt pavement cold-patch quick-repair material provided by the invention: 24-hour compressive strength of 32.5 MPa, 24-hour flexural strength of 5.8 MPa, and initial setting time of 11.5 minutes.
Embodiment 2
[0031] The magnesium phosphate cement used is prepared from magnesium oxide, diammonium hydrogen phosphate, and borax according to the material ratio of 1:0.2:0.06.
[0032] 50 parts of newly prepared magnesium phosphate cement; in addition, 15 parts of fine sand, 10 parts of medium sand, 15 parts of crushed stone with a particle size of 5-20 mm, 5 parts of water-soluble polyurethane, 6 parts of rubber powder, and 0.3 parts of air-entraining agent.
[0033] The technical indicators of the asphalt pavement cold-patch quick repair material provided by the invention: 24-hour compressive strength of 30.5 MPa, 24-hour flexural strength of 5.6 MPa, and initial setting time of 12 minutes.
Embodiment 3
[0035] The magnesium phosphate cement used is prepared from magnesium oxide, diammonium hydrogen phosphate and borax according to the ratio of 1:0.25:0.05.
[0036] 30 parts of newly prepared magnesium phosphate cement; in addition, 10 parts of fine sand, 5 parts of medium sand, 10 parts of crushed stone with a particle size of 5-20 mm, 4 parts of emulsified asphalt, 3 parts of rubber powder, and 0 parts of air-entraining agent.
[0037] The technical indicators of the asphalt pavement cold-patch quick repair material provided by the invention: 24-hour compressive strength 31.4 MPa, 24-hour flexural strength 5.5 MPa, initial setting time 13.5 min.
PUM
Property | Measurement | Unit |
---|---|---|
compressive strength | aaaaa | aaaaa |
flexural strength | aaaaa | aaaaa |
compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com