Cold-applied water-based crack pouring sealant and preparation method
A water-based technology of joint glue, applied in the field of modified asphalt, can solve the problems of environmental pollution, complex components, inconvenient operation, etc., and achieve the effects of solving pollution, good permeability, and saving manpower and material resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0016] The preparation method of cold construction water-based caulking glue comprises the following steps:
[0017] 1) Heat 60kg of base petroleum asphalt 70# to 180°C, add 6kg of SBS modifier (Yueyang Petrochemical 791-H), 2kg of petroleum resin, 5kg of high-grade fatty acid saponin, and 2kg of PVA (PVA is low-viscosity PVA with an average molecular weight of 16,000 -20000), stirring evenly, shearing and grinding, and then stirring for 120 minutes;
[0018] 2) Heat the water to 60°C, add 3kg of cationic fast-cracking emulsifier to 22kg of hot water, and stir for 10 minutes;
[0019] 3) Mix the material obtained in step 1) with the material obtained in step 2) and perform shear grinding to obtain a modified emulsified asphalt with an evaporation residue content of 78%, and the softening point of the evaporation residue of the modified emulsified asphalt is 93. For the detection method of evaporation residue content, refer to "Test Regulations for Asphalt and Asphalt Mixtures...
Embodiment 2
[0021] The preparation method of cold construction water-based caulking glue comprises the following steps:
[0022] 1) Heat 55kg of base petroleum asphalt 70# to 170°C, add 8kg of SBS modifier (Yueyang Petrochemical 791-H), 2kg of petroleum resin, 3kg of high-grade fatty acid saponin, and 1kg of PVA (PVA is low-viscosity PVA with an average molecular weight of 16,000 -20000), stirring evenly, shearing and grinding, and then stirring for 120 minutes;
[0023] 2) Heat the water to 65°C, add 1kg of cationic fast-cracking emulsifier to 30kg of hot water, and stir;
[0024] 3) Mix the material obtained in step 1) with the material obtained in step 2) and perform shear grinding to obtain a modified emulsified asphalt with an evaporation residue content of 70%, and the softening point of the evaporation residue of the modified emulsified asphalt is 105. For the detection method of evaporation residue content, refer to "Test Regulations for Asphalt and Asphalt Mixtures in Highway En...
Embodiment 3
[0026] The preparation method of cold construction water-based caulking glue comprises the following steps:
[0027] 1) Heat 55kg of base petroleum asphalt 70# to 190°C, add 10kg of SBS modifier (Yueyang Petrochemical 791-H), 2kg of petroleum resin, 3kg of high-grade fatty acid saponin, and 2kg of PVA (PVA is low-viscosity PVA with an average molecular weight of 16,000 -20000), stirring evenly, shearing and grinding, and then stirring for 120 minutes;
[0028] 2) Heat the water to 75°C, add 3kg of cationic fast-cracking emulsifier to 25kg of hot water, and stir;
[0029] 3) Mix the material obtained in step 1) with the material obtained in step 2) and perform shear grinding to obtain a modified emulsified asphalt with an evaporation residue content of 75%, and the softening point of the evaporation residue of the modified emulsified asphalt is 109. For the detection method of evaporation residue content, refer to "Test Regulations for Asphalt and Asphalt Mixtures in Highway E...
PUM
Property | Measurement | Unit |
---|---|---|
solid content | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com