A technology for effluent treatment and shale, applied in mining wastewater treatment, multi-stage water treatment, water/sewage treatment, etc., can solve the problems of slow treatment speed, large floor space, poor economy, etc. cost, reducing the content of ammonia nitrogen, and preventing internal scaling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] The shale gas produced water treatment method of the present embodiment has the steps as follows,
[0036] Step 1: adjust the pH of the shale gas production water to 7 in the pH adjustment tank, and obtain the material after adjusting the pH value;
[0037] Step 2: Pump the produced water after pH adjustment into the electrocoagulation device, the reaction current of the device is 45A, and the produced water flow rate is 10m 3 / h, the material after the electrocoagulation reaction flows into the flocculation sedimentation tank through the pipeline;
[0038] Step 3: adjust the pH value of the material obtained in step 2 to 8 after electrocoagulation, and produce a coagulation after stirring. After solid-liquid separation with a plate and frame filter press, clear liquid and massive solid are obtained, and the massive Recycling of solids, such as making bricks, etc.;
[0039] Step 4: Import the clear liquid obtained in step 3 into the heating tank and heat it for 20 minut...
Embodiment 2
[0043] The shale gas production water standard discharge treatment process in this implementation example, the steps are as follows:
[0044] The shale gas produced water treatment method of the present embodiment has the steps as follows,
[0045] Step 1: adjust the pH of the shale gas production water to 8 in the pH adjustment tank, and obtain the material after adjusting the pH value;
[0046] Step 2: Pump the produced water after pH adjustment into the electrocoagulation device, the reaction current of the device is 55A, and the produced water flow rate is 15m 3 / h, the material after the electrocoagulation reaction flows into the flocculation sedimentation tank through the pipeline;
[0047] Step 3: adjust the pH value of the material obtained in step 2 to 8 after electrocoagulation, and produce a coagulation after stirring. After solid-liquid separation with a plate and frame filter press, clear liquid and massive solid are obtained, and the massive Recycling of solids...
Embodiment 3
[0052] Step 1: adjust the pH of the shale gas production water to 5 in the pH adjustment tank, and obtain the material after adjusting the pH value;
[0053] Step 2: Pump the produced water after pH adjustment into the electrocoagulation device, the reaction current of the device is 45A, and the produced water flow rate is 10m 3 / h, the material after the electrocoagulation reaction flows into the flocculation sedimentation tank through the pipeline;
[0054] Step 3: adjust the pH value of the material obtained in step 2 to 8 after electrocoagulation, and produce a coagulation after stirring. After solid-liquid separation with a plate and frame filter press, clear liquid and massive solid are obtained, and the massive Recycling of solids, such as making bricks, etc.;
[0055] Step 4: Import the clear liquid obtained in step 3 into the heating tank and heat for 20 minutes to raise the temperature to 80°C; then add sodium carbonate to the heating tank and react for 30 minutes, ...