Asphalt cement for high-strength micro-surfacing capable of rapidly opening traffic
A technology for open traffic and asphalt glue, applied in building insulation materials, building components, buildings, etc., can solve the problems of high requirements for emulsifiers, unattainable open traffic time, slow cracking and fast setting of emulsified asphalt, etc., to improve construction efficiency. and road performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0028] Its preparation method comprises the following steps:
[0029] 1. Preheat 50-66 parts by weight of road petroleum asphalt under the condition of 130-140°C for use, the time is not limited, 30-120 minutes is recommended, and the asphalt is flowing;
[0030] 2. Mix 1-3 parts by weight of quaternary ammonium salt type cationic imidazoline surfactant with 30-46 parts by weight of water to prepare soap liquid, and control the temperature during the preparation process at 50-80°C;
[0031] 3.2-4 parts by weight of styrene-ethylene-propylene-styrene block copolymer (SEPS), at a temperature of 130-150 ° C, put into the asphalt in step 1, at a speed of 2000-3000 rpm Cut for 20-30 minutes;
[0032] 4. Add the soap solution in step 2 into the emulsified asphalt machine, and undergo mechanical action such as pressurized shearing and grinding to generate a new type of modified emulsified asphalt. The output temperature of the modified emulsified asphalt should be controlled between...
Embodiment 1
[0035] 1. Place 55 parts by weight of No. 70 base asphalt in an oven at 135°C to keep warm and preheat for 60 minutes; 2. Mix 2 parts by weight of quaternary ammonium salt cationic imidazoline surfactant with 40 parts by weight of water Mix to prepare a soap solution, the temperature of the preparation process is controlled at 50-80°C; 3.2 parts by weight of styrene-ethylene-propylene-styrene block copolymer (SEPS) are put into the asphalt in step 1, At a temperature of 135°C, shear at a speed of 3000 rpm for 30 minutes; 4. Add the soap solution in step 2 to the emulsified asphalt machine, and undergo mechanical action such as pressurized shearing and grinding to generate a new type of modified emulsified asphalt , the output temperature of the modified emulsified asphalt should be controlled at 90±2°C; 5. Mix 0.5 parts by weight of isocyanate and 0.5 parts by weight of Guerbet alcohol at room temperature and stir evenly, and put them in 2 hours before construction into the mo...
Embodiment 2
[0042] 1. Place 50 parts by weight of No. 70 base asphalt in an oven at 135°C to keep warm and preheat for 60 minutes; 2. Mix 2 parts by weight of quaternary ammonium salt type cationic imidazoline surfactant with 43 parts by weight of water Mix and prepare soap liquid, the temperature of the preparation process is controlled at 50-80°C; 3.3 parts by weight of styrene-ethylene-propylene-styrene block copolymer (SEPS), put into the asphalt in step 1, At a temperature of 135°C, shear at a speed of 3000 rpm for 30 minutes; 4. Add the soap solution in step 2 to the emulsified asphalt machine, and undergo mechanical action such as pressurized shearing and grinding to generate a new type of modified emulsified asphalt , the output temperature of this modified emulsified asphalt should be controlled at 90±2°C; 5. Mix 1 part by weight of isocyanate and 1 part by weight of Guerbet alcohol at room temperature and stir evenly, and put them into the place 2 hours before construction into ...