An epoxy resin-based composite structure inspection well cover and its preparation method
A technology of epoxy resin and composite structure, which is applied in the field of mineral materials and municipal building materials, can solve the problems of affecting the fluidity of resin, affecting the molding process, and cumbersome preparation process, and achieves the advantages of reducing shrinkage performance, reducing dosage, and large interface area Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0048] A method for preparing an inspection manhole cover with an epoxy resin-based composite structure, comprising the following steps:
[0049] Step 1: Check the preparation of the bottom layer of the well cover structure: weigh 100 parts of E44 epoxy resin, 5-10 parts of industrial absolute ethanol, 30-40 parts of T31 curing agent, 0.1-0.2 parts of PP fiber, 5 parts of liquid nitrile rubber, 400-600 parts of quartz fine sand, mixed evenly according to the above sequence, poured into the inspection manhole cover mold, and its thickness is 1 / 2 of the embedded depth of the inspection manhole cover;
[0050] Step 2: the laying of basalt fiber mesh cloth: on the bottom layer of the structure prepared in step 1, lay the basalt fiber mesh cloth whose diameter is 3 / 4 of the inspection manhole cover diameter, and roll the fiber mesh cloth so that it is consistent with the structure The bottom layer has good contact and improves the bonding performance of the layer.
[0051] Step 3:...
Embodiment 1
[0054]Step 1: Check the preparation of the bottom layer of the well cover structure: weigh 100Kg of E44 epoxy resin, 5Kg of industrial absolute ethanol, 30Kg of T31 curing agent, 0.1Kg of PP fiber, 5Kg of liquid nitrile rubber, and 400Kg of fine quartz sand, and mix them evenly in the above order , Pour it into the manhole cover mold, and lay epoxy mortar with a thickness of 30mm and a diameter of 500mm as the bottom layer of the manhole cover structure.
[0055] Step 2: Laying of basalt fiber mesh cloth: On the bottom layer of the structure prepared in step 1, with the center of the inspection manhole cover as the center, lay basalt fiber mesh cloth with a diameter of 375 mm, and roll the fiber mesh cloth to make it It has good contact with the bottom layer of the structure and improves the bonding performance.
[0056] Step 3: Check the preparation of the surface layer of the well cover structure: weigh 100Kg of E44 epoxy resin, 5Kg of industrial absolute ethanol, 30Kg of T3...
Embodiment 2
[0062] Step 1: Check the preparation of the bottom layer of the well cover structure: weigh 100Kg of E44 epoxy resin, 6Kg of industrial absolute ethanol, 35Kg of T31 curing agent, 0.15Kg of PP fiber, 5Kg of liquid nitrile rubber, and 400Kg of fine quartz sand, and mix them evenly in the above order , Pour it into the manhole cover mold, and lay epoxy mortar with a thickness of 30mm and a diameter of 500mm as the bottom layer of the manhole cover structure.
[0063] Step 2: Laying of basalt fiber mesh cloth: On the bottom layer of the structure prepared in step 1, with the center of the inspection manhole cover as the center, lay basalt fiber mesh cloth with a diameter of 375 mm, and roll the fiber mesh cloth to make it It has good contact with the bottom layer of the structure and improves the bonding performance.
[0064] Step 3: Check the preparation of the surface layer of the well cover structure: weigh 100Kg of E44 epoxy resin, 6Kg of industrial absolute ethanol, 35Kg of ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| bending strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More