A composite material and functionalized technology, which is applied in building insulation materials, building components, buildings, etc., can solve the problems of general thermal and oxidative aging resistance and less aging and degradation problems of SBS, so as to inhibit agglomeration, improve long-term performance, and improve dispersion sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Mix 24 parts (mass parts, the same below) of functionalized assembly modified LDHs, 70 parts of SBS, 0.5 parts of dibenzoyl peroxide, 0.5 parts of fatty acid zinc, and 5 parts of aliphatic hydrocarbon oil, and then add the mixture to The torque rheometer was kneaded at a high speed for 5 minutes at 120 °C; finally, the SBS composite kneaded by the torque rheometer was pulverized for 3 minutes by a high-speed pulverizer to obtain a functionally assembled LDHs / SBS composite material.
[0029] Heat 94.99 parts of asphalt to a fluid state, slowly add 5 parts of functionalized assembled LDHs / SBS composite materials and 0.01 part of sulfur to the asphalt under low-speed stirring, and melt blend for 60 minutes at 160 ° C and high shear rate 5000 rpm Finally, stop high-speed shearing and change to low-speed stirring for 90 min to prepare functionally assembled LDHs / SBS composite modified asphalt with excellent compatibility, stability, thermal oxygen and ultraviolet aging resist...
Embodiment 2
[0036] Mix 45 parts (mass parts, the same below) of functionalized assembly modified LDHs, 45 parts of SBS, 0.5 part of dibenzoyl peroxide, 0.5 part of fatty acid zinc, and 9 parts of aliphatic hydrocarbon oil, and then add the mixture to The torque rheometer was kneaded at a high speed for 5 minutes at 120 °C; finally, the SBS composite kneaded by the torque rheometer was pulverized for 3 minutes by a high-speed pulverizer to obtain a functionally assembled LDHs / SBS composite material.
[0037]Heat 84.95 parts of asphalt to a fluid state, slowly add 15 parts of functionalized LDHs / SBS composite materials and 0.05 parts of sulfur to the asphalt under low-speed stirring, and melt blend for 60 min at 160 °C and high shear rate of 5000 rpm Finally, stop high-speed shearing and change to low-speed stirring for 90 min to prepare functionally assembled LDHs / SBS composite modified asphalt with excellent compatibility, stability, thermal oxygen and ultraviolet aging resistance.
Embodiment 3
[0044] Mix 30 parts (mass parts, the same below) of functionalized assembly modified LDHs, 60 parts of SBS, 1 part of dibenzoyl peroxide, 1 part of fatty acid zinc, and 8 parts of aliphatic hydrocarbon oil, and then add the mixture to The torque rheometer was kneaded at a high speed for 5 minutes at 120 °C; finally, the SBS compound kneaded by the torque rheometer was pulverized for 3 minutes by a high-speed pulverizer, and the functionalized magnesium-aluminum-based layered double hydroxyl metal hydroxide ( LDHs) / SBS composites.
[0045] Heat 90 parts of asphalt to a flow state, slowly add 9.99 parts of functionalized LDHs / SBS composite material and 0.01 part of sulfur to the asphalt under low-speed stirring, and carry out melt blending at 160 °C and high shear rate of 5000 rpm for 60 min Finally, stop high-speed shearing and change to low-speed stirring for 90 min to prepare functionally assembled LDHs / SBS composite modified asphalt with excellent compatibility, stability, t...