A method for separating lead, arsenic and copper in high-lead and high-arsenic copper slag
A high-lead slag and high-lead technology is applied in the field of arsenic, copper, and lead in the separation of high-lead and high-arsenic copper slag. It can solve the problems of ineffective separation of lead and arsenic, large resource and energy consumption, and reduced resource recovery benefits. Achieve the effect of saving consumption, less resource consumption and reducing production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0061] The high-lead and high-arsenic copper slag is the copper slag produced in the process of producing blister copper by blowing of lead matte and arsenic matte, and the components of the copper slag include Pb: 20-35%, As: 7-12%, Containing Cu: 6-20%.
[0062] A method for separating lead, arsenic and copper in high-lead and high-arsenic copper slag, the method comprises the following steps:
[0063] (1) Add high-lead, high-arsenic copper slag and auxiliary materials into a bottom-blown melting furnace for melting at 1050°C; details are as follows:
[0064] a: After the smelting furnace is started, in the first 2 hours, the high-lead and high-arsenic copper slag to be processed and the first part of pyrite are metered by the quantitative feeder, and then continuously fed into the bottom blowing smelting furnace through the belt. Complete the high-lead and high-arsenic copper slag to be processed and add the first part of pyrite;
[0065] B: then within 3 hours, add the s...
Embodiment 2
[0073] The high-lead and high-arsenic copper slag is the copper slag produced in the process of producing blister copper by blowing of lead matte and arsenic matte, and the components of the copper slag include Pb: 20-35%, As: 7-12%, Containing Cu: 6-20%.
[0074] A method for separating lead, arsenic and copper in high-lead and high-arsenic copper slag, the method comprises the following steps:
[0075] (1) Add high-lead, high-arsenic copper slag and auxiliary materials into a bottom-blown melting furnace for melting at 1050°C; details are as follows:
[0076] a: After the smelting furnace is started, in the first 2 hours, the high-lead and high-arsenic copper slag to be processed and the first part of pyrite are metered by the quantitative feeder, and then continuously fed into the bottom blowing smelting furnace through the belt. Complete the high-lead and high-arsenic copper slag to be processed and add the first part of pyrite;
[0077] b: Then within 3 hours, add the s...
Embodiment 3
[0085] The high-lead and high-arsenic copper slag is the copper slag produced in the process of producing blister copper by blowing of lead matte and arsenic matte, and the components of the copper slag include Pb: 20-35%, As: 7-12%, Containing Cu: 6-20%.
[0086] A method for separating lead, arsenic and copper in high-lead and high-arsenic copper slag, the method comprises the following steps:
[0087] (1) Add high-lead, high-arsenic copper slag and auxiliary materials into a bottom-blown melting furnace for melting at 1050°C; details are as follows:
[0088] a: After the smelting furnace is started, in the first 2 hours, the high-lead and high-arsenic copper slag to be treated, the first part of pyrite and quartz stone are measured by the quantitative feeder, and then continuously added to the bottom blowing smelting through the belt In the furnace, the high lead and high arsenic copper slag to be processed and the first part of pyrite are added;
[0089] B: then within 3...