Low-temperature quick repair mortar for pavement and preparation method for low-temperature quick repair mortar
A repair mortar, low temperature technology, applied in the field of building materials, can solve the problems of high epoxy resin price, drying shrinkage cracking, poor aging resistance, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Example 1: The components and proportions (percentage by weight) of the road surface low-temperature rapid repair mortar are: Portland cement: 25, aluminate cement: 8.5, anhydrite: 5, quartz sand: 50, steel slag sand: 10 , EVA latex powder: 1.0, hydroxyethyl methylcellulose: 0.2, lithium carbonate: 0.2, silicone defoamer: 0.1. Its total parts by weight is 100 parts. Add 22 parts of tap water to 100 parts of mortar.
[0020] The performance results obtained by the detection test are shown in Table 1.
[0021] Table 1 Example 1 Pavement Low Temperature Rapid Repair Mortar Performance Test Results
[0022]
Embodiment 2
[0023] Example 2: The components and proportions (percentage by weight) of the low-temperature quick-repair mortar for pavement are: Portland cement: 31.8, aluminate cement: 6, anhydrite: 3.5, quartz sand: 45, steel slag sand: 12 , EVA latex powder: 1.2, hydroxyethyl methylcellulose: 0.15, lithium carbonate: 0.3, silicone defoamer: 0.05. Its total parts by weight is 100 parts. Add 20 parts of tap water to 100 parts of mortar.
[0024] The performance results obtained by the detection test are shown in Table 2.
[0025] Table 2 Performance test results of the road surface low-temperature rapid repair mortar in Example 2
[0026]
[0027] It can be seen from the above examples that the low-temperature quick-repair mortar for pavement according to the present invention can prepare quick-repair mortars used in low-temperature environments with different strength levels. All performance indicators meet or exceed the relevant standards and actual engineering requirements, and ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| viscosity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 