Back chipping-free butt plate submerged-arc welding method
A technology of submerged arc welding without cleaning the root, which is applied in the direction of arc welding equipment, welding equipment, workpiece edge, etc., which can solve the difficulty of increasing the back weld bead clearing and melting the front weld bead root, difficult to control the 4-5mm gap, and spot welding Unstable position quality and other problems, to achieve the effect of small deformation, reduced welding deformation, and less weld bead
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0034] Submerged arc welding steel plate tailor welding process, steel plate grade Q235B, plate thickness 18mm, plate length 7m, plate width 2 meters, the welding steps are as follows:
[0035] (1) Groove preparation: I-shaped groove, the groove processing method is edge milling machine edge milling, after edge milling, clean the burr, and enter the next process after passing the visual inspection;
[0036] (2) Assembly preparation: Assemble the two boards, adjust the groove gap to 0mm, the specific operation is to directly align the sides without leaving a gap, and the maximum inspection gap does not exceed 2mm, and enter the next process after passing the inspection;
[0037] (3) Assembly process: spot welding, fix the two plates, the spot welding length is 30-40mm, the welding spot spacing is 400-500mm, and the reinforcement is less than 1.5mm;
[0038] (4) Preparation before frontal welding: cleaning the surface of the steel plate within 20mm of the groove and the vicinity...
Embodiment approach 2
[0044] Submerged arc welding steel plate tailor welding process, steel plate grade Q235B, plate thickness 26mm, plate length 10m, plate width 2 meters, welding steps are as follows:
[0045] (1) Groove preparation: Y-shaped groove, groove processing method is edge milling machine, blunt edge thickness 18mm, groove angle 90 degrees, after edge milling, clean the burr, and enter the next process after passing the visual inspection ;
[0046] (2) Assembly preparation: Assemble the two boards, adjust the groove gap to 0mm, the specific operation is to directly align the sides without leaving a gap, and the maximum inspection gap does not exceed 2mm, and enter the next process after passing the inspection;
[0047] (3) Assembly process: spot welding, fix the two plates, the spot welding length is 30-40mm, the welding spot spacing is 400-500mm, and the reinforcement is less than 1.5mm;
[0048] (4) Preparation before frontal welding: cleaning the surface of the steel plate within 3...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Plate thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
