A component with a new shaft-hole connection method and its preparation method
A connection method and a new type of technology, applied in the direction of bearing components, shafts, shafts and bearings, etc., can solve the problems of high processing cost, abrasive tools and precision limitations, lack of flexibility, etc., to achieve simple processing, ensure strength, and improve connection strength Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Embodiment 1, with reference to Figure 2-6 , a component of a new shaft-hole connection method described in this specific embodiment includes a flat shaft 1 welded on the input shaft 3 of the hydraulic gear pump and a flat shaft sleeve 2 welded on the output shaft 4 of the power take-off, the Welding grooves are provided at the docking position of the flat shaft sleeve 2 and the output shaft 4 , and the flat shaft 1 is fixed in the flat shaft sleeve 2 by shrink fitting or pressing.
[0043] The end surface of the input shaft 3 is provided with a groove 5 for inserting the flat shaft 1 to improve the shearing resistance.
[0044] The depth of the groove 5 is 15mm.
[0045] The flat shaft 1 is heated to 80°C for shrink fitting, and the flat shaft sleeve 2 is heated to 130°C for shrink fitting.
[0046] The included angle of the welding groove is 70 degrees, so as to facilitate the welding of both.
[0047] The flat shaft 1 is a flat shaft with tangent planes 6 on both...
Embodiment 2
[0050] Example 2, the preparation method of a component with a new shaft-hole connection method described in this specific implementation mode includes the following steps:
[0051] 1) Cutting: select a round bar, cut a material with a length of 55±2mm from the round bar, and a diameter of 60mm;
[0052] 2) Rough turning: Use ordinary lathe to turn the outer circle, end face and punch positioning holes. The rough turning is carried out twice. When rough turning the outer circle, the rough turning allowance is 0.5mm, the cutting speed is 140m / min, and the feed rate is 0.20mm / r;
[0053] 3) Drilling: use a radial drilling machine, drill a middle hole at the center, and the diameter of the middle hole is 5mm;
[0054] 4) Quenching and tempering treatment: quenching treatment first, and then high-temperature tempering treatment in the temperature range of 620°C to enhance the strength, plasticity and toughness of the component, and the hardness is HRC55;
[0055] 5) Finish turni...
Embodiment 3
[0064] Example 3, the preparation method of a component with a new shaft-hole connection method described in this specific implementation mode includes the following steps:
[0065] 1) Blanking: select a round bar, cut a material with a length of 60±2mm from the round bar, and a diameter of 56mm;
[0066] 2) Rough turning: use ordinary lathe to turn the outer circle, end face and punch positioning holes. The rough turning is carried out twice. When rough turning the outer circle, the rough turning allowance is 0.6mm, the cutting speed is 160m / min, and the feed rate is 0.18mm / r;
[0067] 3) Drilling: use a radial drilling machine, drill a middle hole at the center, and the diameter of the middle hole is 5mm;
[0068] 4) Quenching and tempering treatment: quenching treatment first, and then high-temperature tempering treatment in the temperature range of 600°C to enhance the strength, plasticity and toughness of the component, and the hardness is HRC56;
[0069] 5) Finish turn...
PUM
| Property | Measurement | Unit |
|---|---|---|
| angle | aaaaa | aaaaa |
| depth | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


