A low-segregation gas valve steel continuous casting slab and its manufacturing method
A manufacturing method and technology for valve steel, applied in the field of low segregation continuous casting billet manufacturing, can solve the problem of free ferrite, reticulated carbide and carbide particle size exceeding the standard, limited casting cooling conditions for die-casting ingots, and two-phase ingots. Wide range of line temperature and other problems, to achieve the effect of eliminating thermal stress and structural transformation stress, small size of reticulated carbide particles, and improving casting qualification rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] This embodiment adopts the 42Cr produced by the continuous casting slab manufacturing method of the present invention 9 Si 2 The continuous casting billet with the continuous casting number 118L-55 and the specification of 150*150mm. The process flow specifically includes the following steps:
[0039] a. Inject molten steel into the tundish
[0040] In this embodiment, the raw material of the continuous casting billet is 42Cr 9 Si 2 Steel, 42Cr first 9 Si 2 The steel is refined into molten steel through a steel furnace or the finished molten steel is directly used. The number of continuous casting bales is 3, that is, 3 furnaces are continuously fired. The furnace numbers are 118F-221, 118F-222 and 118F-223 respectively. In the hanging bag, it is transported to the turntable by a crane. The temperature of the hanging bag and the temperature of the turntable should be slightly higher than the melting point of the molten steel to prevent it from solidifying before r...
Embodiment 2
[0061] This embodiment adopts the 42Cr produced by the continuous casting slab manufacturing method of the present invention 9 Si 2 The continuous casting billet with the continuous casting number 118L-79 and the specification of 150*150mm. The process flow specifically includes the following steps:
[0062] a. Inject molten steel into the tundish
[0063] In this embodiment, the raw material of the continuous casting billet is 42Cr 9 Si 2 Steel, 42Cr first 9 Si 2 The steel is refined into molten steel through a steel furnace or the finished molten steel is directly used. The number of continuous casting bales is 4, that is, 4 furnaces are continuously fired. The furnace numbers are 118F-351, 118F-352, 118F-353 and 118F-354. The molten steel is packed in a hanging bag and transported to the turntable by a crane. The temperature of the hanging bag and the temperature of the turntable should be slightly higher than the melting point of the molten steel to prevent it from s...
PUM